Indexing metadata

Risk Analysis of Occupational Health and Safety Using Hazard Identification, Risk Assessment and Risk Control (HIRARC) Method (Case Study in PT Barokah Galangan Perkasa)


 
Dublin Core PKP Metadata Items Metadata for this Document
 
1. Title Title of document Risk Analysis of Occupational Health and Safety Using Hazard Identification, Risk Assessment and Risk Control (HIRARC) Method (Case Study in PT Barokah Galangan Perkasa)
 
2. Creator Author's name, affiliation, country Andi Giovanni; Mulawarman University; Indonesia
 
2. Creator Author's name, affiliation, country Lina Dianati Fathimahhayati; Mulawarman University; Indonesia
 
2. Creator Author's name, affiliation, country Theresia Amelia Pawitra; Mulawarman University; Indonesia
 
3. Subject Discipline(s)
 
3. Subject Keyword(s) Occupational Health and Safety Hazard Identification, Risk Control and Risk Assessment (HIRARC)
 
4. Description Abstract

PT Barokah Galangan Perkasa is a company located in East Kalimantan that is engaged in the manufacturing, repair, and maintenance of ships. The welding activity is the most dominant in shipbuilding, but the implementation of the occupational health and safety (OHS) system is not optimal. There have been several work accidents in the upper accommodation and cargo oil tank areas, such as falling from a height, being hit by welding sparks, and an electrical short circuit. The working conditions in this area are quite risky. Therefore, research on risk analysis is needed. HIRARC is a method for identifying a problem that is assessed at risk based on the likelihood and severity where the results of the assessment can determine the level of risk and give risk control for each work activity. Research results show that there were 40 potential hazards in the upper accommodation area with 77% low risk level, 12% moderate risk level, 8% high risk level, and 3% very high risk level. While in the cargo oil tank area there was 37 potentials hazard with 84% low risk level, 13% moderate risk level, and 3% high risk level. By knowing the risk level, companies can identify work activities that require prioritized improvement. They can also determine appropriate control to prevent the occurrence of such risks. Risk control in the upper accommodation area can be achieved through the implementation of administrative controls, utilization of PPE, and technical engineering controls. 

 
5. Publisher Organizing agency, location Program Pascasarjana Magister Teknik Industri Universitas Mercu Buana
 
6. Contributor Sponsor(s)
 
7. Date (YYYY-MM-DD) 2023-06-30
 
8. Type Status & genre Peer-reviewed Article
 
8. Type Type
 
9. Format File format PDF
 
10. Identifier Uniform Resource Identifier https://publikasi.mercubuana.ac.id/index.php/ijiem/article/view/20398
 
10. Identifier Digital Object Identifier (DOI) http://dx.doi.org/10.22441/ijiem.v4i2.20398
 
11. Source Title; vol., no. (year) IJIEM - Indonesian Journal of Industrial Engineering and Management; Vol 4, No 2: June 2023
 
12. Language English=en en
 
13. Relation Supp. Files
 
14. Coverage Geo-spatial location, chronological period, research sample (gender, age, etc.)
 
15. Rights Copyright and permissions Copyright (c) 2023 IJIEM - Indonesian Journal of Industrial Engineering and Management
Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.