[1]
Murdiyanto, E. and Susetyo, B. 2025. Faktor Pendorong dan Penghambat Penerapan Building Information Modelling (BIM) 3D di Konsultan Manajemen Konstruksi (KMK). Rekayasa Sipil. 13, 1 (Feb. 2025), 58–64. DOI:https://doi.org/10.22441/jrs.2024.v13.i1.07.