[1]
Joshua, J. and Sunandar, A. 2026. ANALISIS PENGARUH FAKTOR PERENCANAAN DAN FAKTOR PELAKSANAAN TERHADAP KETERLAMBATAN PROYEK JALAN TOL PROBOLINGGO – BANYUWANGI PAKET 2. Rekayasa Sipil. 14, 2 (Mar. 2026), 97–107. DOI:https://doi.org/10.22441/jrs.2025.v14.i2.11.