Joshua, J., & Sunandar, A. (2026). ANALISIS PENGARUH FAKTOR PERENCANAAN DAN FAKTOR PELAKSANAAN TERHADAP KETERLAMBATAN PROYEK JALAN TOL PROBOLINGGO – BANYUWANGI PAKET 2. Rekayasa Sipil, 14(2), 97–107. https://doi.org/10.22441/jrs.2025.v14.i2.11