JOSHUA, Joshua; SUNANDAR, Ali. ANALISIS PENGARUH FAKTOR PERENCANAAN DAN FAKTOR PELAKSANAAN TERHADAP KETERLAMBATAN PROYEK JALAN TOL PROBOLINGGO – BANYUWANGI PAKET 2. Rekayasa Sipil, Jakarta, Indonesia, v. 14, n. 2, p. 97–107, 2026. DOI: 10.22441/jrs.2025.v14.i2.11. Disponível em: https://publikasi.mercubuana.ac.id/index.php/jrs/article/view/jrs.2025.v14.i2.11. Acesso em: 22 sep. 2026.