Joshua, Joshua, and Ali Sunandar. 2026. “ANALISIS PENGARUH FAKTOR PERENCANAAN DAN FAKTOR PELAKSANAAN TERHADAP KETERLAMBATAN PROYEK JALAN TOL PROBOLINGGO – BANYUWANGI PAKET 2”. Rekayasa Sipil 14 (2). Jakarta, Indonesia:97-107. https://doi.org/10.22441/jrs.2025.v14.i2.11.