Joshua, J. and Sunandar, A. (2026) “ANALISIS PENGARUH FAKTOR PERENCANAAN DAN FAKTOR PELAKSANAAN TERHADAP KETERLAMBATAN PROYEK JALAN TOL PROBOLINGGO – BANYUWANGI PAKET 2”, Rekayasa Sipil. Jakarta, Indonesia, 14(2), pp. 97–107. doi: 10.22441/jrs.2025.v14.i2.11.