Joshua, Joshua, and Ali Sunandar. “ANALISIS PENGARUH FAKTOR PERENCANAAN DAN FAKTOR PELAKSANAAN TERHADAP KETERLAMBATAN PROYEK JALAN TOL PROBOLINGGO – BANYUWANGI PAKET 2”. Rekayasa Sipil, vol. 14, no. 2, Mar. 2026, pp. 97-107, doi:10.22441/jrs.2025.v14.i2.11.