Joshua, Joshua, and Ali Sunandar. “ANALISIS PENGARUH FAKTOR PERENCANAAN DAN FAKTOR PELAKSANAAN TERHADAP KETERLAMBATAN PROYEK JALAN TOL PROBOLINGGO – BANYUWANGI PAKET 2”. Rekayasa Sipil 14, no. 2 (March 31, 2026): 97–107. Accessed September 22, 2026. https://publikasi.mercubuana.ac.id/index.php/jrs/article/view/jrs.2025.v14.i2.11.