ANALISIS FAKTOR-FAKTOR YANG BERDAMPAK PADA RISIKO DAN KETIDAKPASTIAN PERMINTAAN JALAN TOL DI INDONESIA
Abstract
Full Text:
PDFReferences
Deputi Bidang Sarana dan Prasarana Badan Perencanaan dan Pembangunan Nasional. (2015). Prioritas Pembangunan Infrastruktur 2016. Jakarta.
Vajdic, N., & Damnjanovic, I. (2011). Risk Management in Public-Private Partnership Road Projects Using the Real Options Theory. International Simposium Engineering Management And Competitiveness, 155-160.
Wibowo, A. (2015). Opsi Terminasi Sebagai Instrumen Dukungan Pememrintah untuk Proyek Infrastruktur Berisiko Permintaan Tinggi. Jurnal Teoretis dan Terapan Bidang Rekayasa Sipil, Vol. 22, No. 3 , 191-200.
Thomas, A.V., Kalidindi, S.N., dan Ananthanarayanan, K. (2003). “Risk Perception Analysis of BOT Road Project Participants in India”. Construction Management and Economics, Vol. 21, No. 4, 393 – 407.
Bain, R. (2009). Error and Optimism Bias in Toll Road Traffic Forecasts. Transportation, Vol. 36, No. 5, 469-482.
Flyvbjerg, B., Holm, M., & Buhl, S. (2006). Inacuracy in Traffic Forecasts. Transport Review, Vol. 26, No. 1, 1-24.
Undang-Undang Republik Indonesia Nomor 38 tahun 2004. Jalan. Jakarta.
Regan, M., Smith, J., & Love, P. E. (2011). Impact Of The Capital Market Collapse On Public Private Partnership Infrastructure Projects. Journal Of Construction Engineering And Management, 6-16.
Rosadin, M. I. (2011). Optimasi Skema Kerjasama Pemerintah Swasta Dalam Pembangunan Jalan Tol Study Kasus : Jalan Tol Bandara Juanda-Tanjung Perak. Tesis, Universitas Indonesia, Depok.
Novianti, T. (2011). Pemodelan Risiko Pendapatan Proyek Infrastruktur Jalan Tol dengan Pendekatan Fault Tree Analysis. Jurnal Teknik dan Manajemen Industri, Vol. 6, No. 2, 138-149.
Widiatmoko, D. (2008). Model Stokastik Kelayakan Finansial Proyek Jalan Tol Berbasis Adjusted Present Value (APV) Studi Kasus Ruas Jalan Tol Dalam Kota Bandung. Universitas Katolik Parahyangan, Bandung
Alasad, R., Motawa, I., Ogunlana, S. O., & Boateng, P. (2014). Prioritization of Demand Risk Factors in PPP Infrastructure Projects. Construuction Reaserch Congress, 1359-1368.
Jungbecker, A. F., & Alfen, H. (2010). Analysing Traffic Demand Risk in Road Concessions. TG72 - Special Track 18th CIB World Building Congress, pp. 133-148. Salford, United Kingdom: CIB Publication.
Wibowo, M. R. (2010). Perancangan Model Pemilihan MItra Kerja Dalam Penyediaan Rig Darat Dengan Metode Analitic Network Process (ANP). Tesis, Universitas Indonesia, Depok.
Saaty, L.T. (1999). Fundamental of The Analitycal Network Process. ISAHP 1999, Kobe, Japan, August 12-14, 1999, University of Pittsburgh, Pittsburgh, PA: 15260. USA
DOI: http://dx.doi.org/10.22441/jtm.v6i2.1194
Refbacks
- There are currently no refbacks.
Copyright (c) 2017 Jurnal Teknik Mesin
Jurnal Teknik Mesin (JTM)
Program Studi Teknik Mesin, Fakultas Teknik, Universitas Mercu Buana
Jl. Meruya Selatan No. 01, Kembangan, Jakarta Barat 11650, Indonesia
Email: [email protected]
Telp.: 021-5840815/ 021-5840816 (Hunting)
Fax.: 021-5871335
JTM is indexed by the following abstracting and indexing services:
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.