Ariyanto, S. (2024). Implementation of Material Requirement Planning (MRP) on The Procurement of Natural Materials of The KM 48+600 Karawang Toll Road Widening. Proceeding Mercu Buana Conference on Industrial Engineering, 2(1), 84–91. Retrieved from https://publikasi.mercubuana.ac.id/index.php/mbcie/article/view/25149