Ariyanto, S. (2024) “Implementation of Material Requirement Planning (MRP) on The Procurement of Natural Materials of The KM 48+600 Karawang Toll Road Widening”, Proceeding Mercu Buana Conference on Industrial Engineering. Jakarta, Indonesia, 2(1), pp. 84–91. Available at: https://publikasi.mercubuana.ac.id/index.php/mbcie/article/view/25149 (Accessed: 20 September 2026).