[1]
Sudarmaji, H. et al. 2023. Reducing dandori processing time using the single minute exchange of die method in swaging areas in automotive rubber components company. Operations Excellence: Journal of Applied Industrial Engineering. 15, 2 (Nov. 2023), 133–141. DOI:https://doi.org/10.22441/oe.2023.v15.i2.079.