[1]
Rustandi, D.A. et al. 2025. Preventive maintenance scheduling using the periodic replacement and repair count limit policy approach on the Vacotin water heaters machine at PT XYZ. Operations Excellence: Journal of Applied Industrial Engineering. 17, 2 (Jul. 2025), 178–189. DOI:https://doi.org/10.22441/oe.2025.v17.i2.142.