Nuryono, A., Kurnia, H., & Zulkarnaen, I. (2024). Spare parts warehouse re-layout design with kaizen 5S implementation to reduce wasted time searching for machine parts. Operations Excellence: Journal of Applied Industrial Engineering, 15(3), 293–305. https://doi.org/10.22441/oe.2023.v15.i3.095