Putra, E. S. (2019). Peningkatan produktifitas proses perakitan material ban motor dengan metode 8 step quality control circle di Divisi Assembly Building Tire. Operations Excellence: Journal of Applied Industrial Engineering, 11(3), 288–299. https://doi.org/10.22441/oe.v11.3.2019.037