Muqimuddin, M., Pratikno, F. A. and Hertadi, C. D. P. (2025) “Battery pack remanufacturing decisions considering remanufacturing costs and risk priority number in determining repair or replacement”, Operations Excellence: Journal of Applied Industrial Engineering. Jakarta, Indonesia, 17(1), pp. 26–35. doi: 10.22441/oe.2025.v17.i1.128.