Penurunan Downtime Akibat Plug System Error pada Proses Helium Leak Test 3 Menggunakan Metode Eight Steps di PT Pakoakuina 4W

Authors

  • Nicholas Ego Guarsa Politeknik Astra, Indonesia
  • Mutawally Asy Sya’roqie Politeknik Astra, Indonesia

DOI:

https://doi.org/10.22441/pasti.2026.v20i1.011

Keywords:

Conveyor, 8 Step, Downtime

Abstract

PT Pakoakuina Car Wheel, a subsidiary of Pako Group under PT Astra Otoparts and Triputra Group, manufactures steel and aluminum wheels for both OEM and aftermarket markets, serving global brands such as Toyota, Honda, and Perodua. One of the critical stages in the production process is the Helium Leak Test 3 (HeLT3), which is conducted to detect any leakage in the wheels. This test requires wheel cleanliness and proper valve hole sealing, done either manually or automatically. However, frequent downtime occurs due to valve shortages at the in-plug unit, caused by the failure of used valves to return automatically. This study aims to reduce downtime caused by Plug System Error in the Helium Leak Test 3 process using the Eight Steps methodology. The method was employed to identify the current condition, determine the root causes of the problem, and formulate appropriate corrective actions. Based on the analysis results, an improvement was implemented through the design and installation of a valve transfer conveyor system to automate the transfer of valves from the un-plug unit to the in-plug unit. The results indicate that the implemented improvement successfully eliminated the need for manual valve transfer and reduced downtime caused by Plug System Error by 100%.

Downloads

Download data is not yet available.

References

Avrilio, N., Prasetyaningsih, E., & Hidayat, N. (2021). Penerapan Planned Maintenance untuk Mereduksi Downtime Mesin MOJ-3 di Departemen Finishing PT. XYZ. Jurnal Riset Teknik Industri, 1, 68–76. https://doi.org/10.29313/jrti.v1i1.232

Fauzan Arrosyad, M., Eko widodo, dan, Teknik Produksi dan Proses Manufaktur, P., & Astra Cikarang Selatan, P. (2024). Menurunkan Reject Bocor Outer Tube Model 54P Non Gatting di Line Casting dengan Menggunakan Metode Eight Steps di Perusahaan Shock Absorber. XVIII (3), 303–314. https:// doi.org/10.22441/pasti.2024.v18i3.002

Febianti, E., Ferdinant, P. F., Wahyuni, N., & Riyani, D. N. (2020a). Usulan Penjadwalan Perawatan Mesin Menggunakan Metode Reliability Block Diagram. Performa: Media Ilmiah Teknik Industri, 19(1). https://doi.org/10.20961/performa.19.1.40983

Febianti, E., Ferdinant, P., Wahyuni, N., & Riyani, D. (2020b). Usulan Penjadwalan Perawatan Mesin Menggunakan Metode Reliability Block Diagram. Performa: Media Ilmiah Teknik Industri, 19. https://doi.org/10.20961/performa.19.1.40983

Fiatno, A. (2021). Rancang Bangun Belt Conveyor sebagai Alat Material Handling Pengangkut Pasir pada Pembuatan Bata Ringan. Jurnal Teknik Industri Terintegrasi, 4, 36–43. https://doi.org/10.31004/jutin.v4i2.3502

Gintng, L., Daryanto, E., & Izazi, H. (2022). Analisis Pengendalian Mutu Pada Proses Produksi Menggunakan Seven Tools Dalam Upaya Mencapai Zero Defect. RODA: Jurnal Pendidikan Dan Teknologi Otomotif, 2, 1. https://doi.org/10.24114/roda.v2i1.34736

Giovanni, H. (2023). Perancangan Screw Conveyor Vertikal dengan Kapasitas 4000 Kg/Jam untuk Transfer Gabah Kering pada Mesin Penggiling Padi. Jurnal Mesin Galuh, 2, 59–73.

Khamaludin, K., & Respati, A. (2019). Implementasi Metode QCC untuk Menurunkan Jumlah Sisa Sampel Pengujian Compound. Jurnal Optimasi Sistem Industri, 18, 176–185. https://doi.org/10.25077/josi.v18.n2.p176-185.2019

Loganathan, K., & Vijaya Siva Subramani, S. K. (2023). Design and Optimization of Aluminium Alloy Wheel Rim in Automobile Industry. Materials Today: Proceedings. https://doi.org/10.1016/j.matpr.2023.01.207

Pranjono, P., Ngatijo, N., Torowati, T., & Harjanto, N. T. (2017). Analisis Unjuk Kerja Alat Helium Leak Detector. Pengelolaan Instalasi Nuklir, 10(18). https://api.semanticscholar.org/CorpusID:128333553

Sadi, S. (2012). Sistem Pengendali Konveyor Belt pada PT. XYZ Tangerang. Jurnal Teknik, 1. https://doi.org/10.31000/jt.v1i2.1458

Setiawan, R. (2022). Menurunkan Claim Next Process Reject Plate R Cembung pada Proses Perakitan Crankshaft Menggunakan Metode Eight Steps di PT XYZ. Technologic, 13. https://doi.org/10.52453/t.v13i2.417

Sitorus, E., & Nasution, S. (2018). Pembakuan Aktivitas Pergudangan dengan Standard Operating Procedure (SOP) di PT. XYZ. Jurnal Sistem Teknik Industri, 19, 65–71. https://doi.org/10.32734/jsti.v19i2.376

Somadi, S., Priambodo, B., & Okarini, P. (2020). Evaluasi Kerusakan Barang dalam Proses Pengiriman dengan Menggunakan Metode Seven Tools. Jurnal INTECH Teknik Industri Universitas Serang Raya, 6, 1–11. https://doi.org/10.30656/intech.v6i1.2008

Sutedi, H., Chrisnaputra, C., & Zahabiyah, D. R. (2026). Perancangan Line Produksi Perusahaan Manufaktur Otomotif Melalui Implementasi 5S dalam Upaya Peningkatan Kapasitas Produksi Menggunakan Metode Eight Steps. Jurnal Optimalisasi, Vol. 12, (1). https:// doi.org/10.35308/jopt.v12i1.13625

Valentino, D., Alfian, A., Andrean, M. L., Pratama, A. Y., Prasetyo, Y., & Pelita Bangsa, U. (2025). Analisis Cacat Produk Die Casting pada Perusahaan Otomotif dengan Metode Fishbone Diagram. In Journal of Management and Innovation Entrepreunership (JMIE), Vol. 3, (1). https://doi.org/10.70248/jmie.v3i1.2324

Downloads

Published

2026-04-30

How to Cite

1.
Guarsa NE, Sya’roqie MA. Penurunan Downtime Akibat Plug System Error pada Proses Helium Leak Test 3 Menggunakan Metode Eight Steps di PT Pakoakuina 4W. Pasti [Internet]. 2026 Apr. 30 [cited 2026 Oct. 25];20(1):112-24. Available from: https://publikasi.mercubuana.ac.id/index.php/pasti/article/view/39073