[1]
Andriani, D.P. 2017. PENENTUAN WAKTU DAN OUTPUT BAKU PADA PROSES PRODUKSI TUBE LAMP DENGAN METHODS TIME MEASUREMENT. SINERGI. 21, 3 (Nov. 2017), 204–212. DOI:https://doi.org/10.22441/sinergi.2017.3.007.