[1]
Husin, A.E. and Budianto, E.A. 2022. Influential factors in the application of the Lean Six Sigma and time-cost trade-off method in the construction of the ammunition warehouse. SINERGI. 26, 1 (Feb. 2022), 81–90. DOI:https://doi.org/10.22441/sinergi.2022.1.011.