Andriani, D. P. (2017). PENENTUAN WAKTU DAN OUTPUT BAKU PADA PROSES PRODUKSI TUBE LAMP DENGAN METHODS TIME MEASUREMENT. SINERGI, 21(3), 204–212. https://doi.org/10.22441/sinergi.2017.3.007