Husin, A. E., & Budianto, E. A. (2022). Influential factors in the application of the Lean Six Sigma and time-cost trade-off method in the construction of the ammunition warehouse. SINERGI, 26(1), 81–90. https://doi.org/10.22441/sinergi.2022.1.011