Andriani, D. P. (2017) “PENENTUAN WAKTU DAN OUTPUT BAKU PADA PROSES PRODUKSI TUBE LAMP DENGAN METHODS TIME MEASUREMENT”, SINERGI. Jakarta, Indonesia, 21(3), pp. 204–212. doi: 10.22441/sinergi.2017.3.007.