[1]
D. Agung and H. Hasbullah, “REDUCING THE PRODUCT CHANGEOVER TIME USING SMED & 5S METHODS IN THE INJECTION MOLDING INDUSTRY”, Sinergi, vol. 23, no. 3, pp. 199–212, Oct. 2019.