PDCA Cycle Method implementation in Industries: A Systematic Literature Review

Deni Ahmad Taufik

Abstract


The industry's development increasingly makes businesses competitive by increasing technical knowledge and improving systems, both internally and externally. The PDCA (Plan, Do, Check, Action) cycle is a quality management system used as a continuous improvement tool widely used in industries. The PDCA is a continuous improvement tool that is widely used in industries. The PDCA cycle begins with small to check possible effects on systems and eventually progresses to larger and more specific improvements. The implementation of the PDCA method results in solving the problems of qualitative and quantitative data problems that have been widely applied in industries for continuous improvement and as a work pattern in improving a process or system in an organization and increasing productivity. The methodology used in this research is the literature review research paper was published in 2010-2020. The literature review describes the relationship between thinking and gaps in theoretical and practical thinking about applying the PDCA method and the successful implementation in industries as a contribution to further research.

Keywords


Continuous improvement; Industrial; PDCA; Productivity

Full Text:

PDF

References


Ahmed, H. O. K. (2016). A proposed systematic framework for applying hoshin kanri strategic planning methodology in educational institutions. European Scientific Journal, 12(16), 158–194. https://doi.org/10.19044/esj.2016.v12n16p158.

Alshahrani, M., & Alsulaibaikh, A. (2015). Effects of Implementation Of Focus-PDCA Model To Decrease Patients’ length Of Stay In Emergency Department. Al-Azhar Assiut Medical Journal, 13(4), 4–8. http://www.aamj.eg.net/journals/pdf/2664.pdf

Amin, A. N. M., Mahmood, W. H. W., Kamat, S. R., & Abdullah, I. (2018). Conceptual framework of lean ergonomics for assembly process: PDCA approach. Journal of Engineering and Science Research, 2(1), 51-62. https://doi.org/10.26666/rmp.jesr.2018.1.9.

Andira, A., & Haryanto, D. (2019). Analisis Penerapan Konsep Lean Manufacturing pada Penurunan Defect Knuckle Arm Steering dengan Metode PDCA di PT. PQR. Journal of Industrial Engineering, 4(1), 33-46. http://dx.doi.org/10.33021/jie.v4i1.746

Azwir, H. H., & Setyanto, A. K. (2017). Analisis Penerapan Lean Manufacturing Pada Penurunan Cacat Feed Roll Menggunakan Metode PDCA (Studi Kasus PT. XYZ). Jurnal Rekayasa Sistem Industri, 6(2), 105-118. https://doi.org/10.26593/jrsi.v6i2.2714.105-118.

Chandrakanth, K. (2016). Plan Do Check Act (PDCA): Improving quality through agile accountability. TEKTRONIX Engineering Development India Private Limited. 4, 1–10. https://www.agilealliance.org/wp-content/uploads/2016/01/PDCA.pdf

Chen, Y., Zheng, J., Wu, D., Zhang, Y., & Lin, Y. (2020). Application of the PDCA cycle for standardized nursing management in a COVID-19 intensive care unit. Annals of Palliative Medicine, 9(3), 1198-1205. https://doi.org/10.21037/apm-21-1084.

Darmawan, H., Hasibuan, S., & Hardi Purba, H. (2018). Application of Kaizen Concept with 8 Steps PDCA to Reduce in Line Defect at Pasting Process: A Case Study in Automotive Battery. International Journal of Advances in Scientific Research and Engineering,[e-journal], 4(8), 97-107. https://doi.org/10.31695/IJASRE.2018.32800.

Fitriani, I. (2018). Siklus PDCA dan Filosofi Kaizen. Adaara: Jurnal Manajemen Pendidikan Islam, 7(1), 625-640. https://jurnal.iain-bone.ac.id/index.php/adara/article/view/309

Garza-Reyes, J. A., Romero, J. T., Govindan, K., Cherrafi, A., & Ramanathan, U. (2018). A PDCA-based approach to environmental value stream mapping (E-VSM). Journal of Cleaner Production, 180, 335-348. https://doi.org/10.1016/j.jclepro.2018.01.121

Gidey, E., Jilcha, K., Beshah, B., & Kitaw, D. (2014). The plan-do-check-act cycle of value addition. Industrial Engineering & Management, 3(124), 2169-0316. https://doi.org/10.4172/2169-0316.10000124.

Handoko, A. (2017). Implementasi pengendalian kualitas dengan menggunakan pendekatan PDCA dan seven tools pada PT. Rosandex Putra Perkasa Di Surabaya. CALYPTRA, 6(2), 1329-1347. https://journal.ubaya.ac.id/index.php/jimus/article/view/1062

Hasan, Z., & Hossain, M. S. (2018). Improvement of Effectiveness by Applying the PDCA Cycle or Kaizen: An Experimental Study on Engineering Students. Journal of Scientific Research, 10(2), 159–173. https://doi.org/10.3329/jsr.v10i2.35638.

Hasnul, N, Abdul, A., Samsudin, N., & Subawi, R.C. (2019). Development of Strategic Planning to Success ( STRAPS ) System for UiTMCTKKT. International Journal of Advanced Trends in Computer Science and Engineering, 8(1), 60–64. http://www.warse.org/IJATCSE/static/pdf/file/ijatcse13815sl2019.pdf

Iswara, Y., Darmawan, I., & Hediyanto, U. Y. K. S. (2018). Analisis Dan Perancangan Helpdesk Ticketing System Untuk Mengelola Tindak Perbaikan Perangkat Komputer Dan Jaringan Pda Pt. Len Industri (persero) Menggunakan Metodologi Pdca (plan-do-check-act). eProceedings of Engineering, 5(3), 7149–7161. https://core.ac.uk/download/pdf/299926397.pdf

Jagtap, M. M. M., & Teli, S. N. (2015). PDCA Cycle As TQM Tool-continuous improvement of warranty. International Journal on Recent Technologies in Mechanical and Electrical Engineering, 2(4), 01-05. http://www.ijrmee.org/index.php/ijrmee/article/view/210

Khaerudin, D., & Rahmatullah, A. (2020). Implementasi Methode Pdca Dalam Menurunkan Defect Sepatu Type Campus Di Pt. Prima Intereksa IndastrI (PIN). Jurnal Sains dan Teknologi: Jurnal Keilmuan dan Aplikasi Teknologi Industri, 20(1), 34-40. http://ojs.sttind.ac.id/sttind_ojs/index.php/Sain/article/view/228

Khayum, H. M. O. (2017). Quality of Higher Education: Implementation of Kaizen Philosophy. World Journal of Social Science, 7(1), 10-18. https://europepmc.org/article/PPR/PPR98184

Kholif, A. M., Abou El Hassan, D. S., Khorshid, M. A., Elsherpieny, E. A., & Olafadehan, O. A. (2018). Implementation of model for improvement (PDCA‐cycle) in dairy laboratories. Journal of Food Safety, 38(3), e12451. https://doi.org/10.1111/jfs.12451.

Knight, J. E., & Allen, S. (2012). Applying the PDCA cycle to the complex task of teaching and assessing public relations writing. International Journal of Higher Education, 1(2), 67-83. https://doi.org/10.5430/ijhe.v1n2p67.

Kotvitska, A., Lebedynets, V., & Karamavrova, T. (2019). The PDCA cycle implementation at the internal audit process of quality management systems of pharmaceutical companies. The Pharma Innovation Journal. 8(2), 709-713. https://doi.org/10.13140/RG.2.2.21487.07845.

Kurniawan, C., & Azwir, H. H. (2019). Penerapan Metode PDCA untuk Menurunkan Tingkat Kerusakan Mesin pada Proses Produksi Penyalutan. Journal of Industrial Engineering, 3(2), 105-118. http://dx.doi.org/10.33021/jie.v3i2.526

Kurniawan, H., Sumarya, E., & Merjani, A. (2018). Peningkatan Kualitas Produksi Untuk Mengurangi Unit Cacat Insufficient Epoxy Dengan Metode Pdca Di Area Die Attach (Studi Kasus Di PT. Unisem). PROFISIENSI, 5(1),44-50. https://www.journal.unrika.ac.id/index.php/jurnalprofisiensi/article/view/1153

Lodgaard, E., Gamme, I., & Aasland, K. E. (2012, September). Success factors for PDCA as a continuous improvement method in product development. In IFIP International Conference on Advances in Production Management Systems (pp. 645-652). Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-40352-1_81

Longaray, A. A., Laurino, F. C., Goncalves Tondolo, V. A., & Munhoz, P. R. (2017). Applying The PDCA Cycle For Continuous Improvement In A Bovine Confinement System: A Case Study. Electronic Journal of Management & System, 12(3), 353-361. https://www.revistasg.uff.br/sg/article/view/1123

Mahmud, K. S., Nasry, M. N. A., Hilmy, I., & Yusof, M. D. (2015). Development Of A Quality Check Station In A Pharmaceutical Industry To Achieve Zero Defect Production using PDCA Cycle. 10(23), 17421–17426. http://www.arpnjournals.org/jeas/research_papers/rp_2015/jeas_1215_3187.pdf

Matsuo, M., & Nakahara, J. (2013). The effects of the PDCA cycle and OJT on workplace learning. The International Journal of Human Resource Management, 24(1), 195-207. https://doi.org/10.1080/09585192.2012.674961

Meiling, J. H., Sandberg, M., & Johnsson, H. (2014). A study of a plan-do-check-act method used in less industrialized activities: two cases from industrialized housebuilding. Construction Management and Economics, 32(1-2), 109-125. https://doi.org/10.1080/01446193.2013.812227.

Neyestani, B., & Juanzon, J. B. P. (2017). ISO 9001 Standard and Organization's Performance: A Literature Review. -Int. J. Adv. Multidiscip. Res,, 4(2), 6–13. https://doi.org/10.22192/ijam.

Patel, P. M., & Deshpande, V. A. (2017). Application Of Plan-Do-Check-Act Cycle For Quality And Productivity Improvement A Review. International Journal for Research in Applied Science & Engineering Technology (IJRASET), 5(1), 197–201. https://www.ijraset.com/fileserve.php?FID=6095

Pratiwi, A. I., & Wibowo, Y. A. (2018). Pengendalian Kualitas Untuk Meminimasi Reject Start Di Mesin Extruder Menggunakan Metode PDCA di PT Wahana Duta Jaya Rucika. Industry Xplore, 3(1), 1–15. https://doi.org/10.36805/teknikindustri.v3i1.367

Pratiwi, H. Y. (2017). Analisis Penerapan Contractor Safety Management System (CSMS) di PT. X, Bontang, Kalimantan Timur. The Indonesian Journal of Occupational Safety and Health, 6(2), 187-196. https://doi.org/10.20473/ijosh.v6i2.2017.187-196

Rani, A. M., & Mulyana, D. (2016). Upaya Mengurangi Volume Minyak Flushing Produk TBHQ Selama Pergantian Produk Di Mesin Kombinator 3 Pt Asianagaro Agung Jaya Menggunakan Metode PDCA. 1(4), 26–31. https://doi.org/10.37859/jst.v1i04.1184

Realyvásquez-Vargas, A., Arredondo-Soto, K. C., Carrillo-Gutiérrez, T., & Ravelo, G. (2018). Applying the Plan-Do-Check-Act (PDCA) Cycle to Reduce the Defects in the Manufacturing Industry. A Case Study. Applied Sciences, 8(11), 2181. https://doi.org/10.3390/app8112181.

Salunke, K. A., Lambhate, V., Jadhav, U., & Kumbhar, S. (2016). Optimization of Pipe Finning Process with Engineering Principles. International Journal of Science and Research (IJSR).5(3), 270–272. https://www.ijsr.net/archive/v5i3/NOV161849.pdf

Sidhu, B. S., Kumar, V., & Bajaj, A. (2013). The" 5S" Strategy by Using PDCA Cycle for Continuous Improvement of the Manufacturing Processes in Agriculture Industry. International Journal of Research in Industrial Engineering, 2(3), 10-23. http://www.riejournal.com/article_47948.html

Silva, A. S., Medeiros, C. F., & Vieira, R. K. (2017). The Cans Loss Index in a beverage company. Journal of Cleaner Production, 150, 324–338. https://doi.org/10.1016/j.jclepro.2017.03.033.

Smith, P. G. (2016). Development of a four stage continuous improvement framework to support business performance in manufacturing SMEs .Doctoral dissertation. University of Wolverhampton. https://wlv.openrepository.com/handle/2436/618585

Soesilo, R. (2017). Implementasi Konsep A3 Untuk Mengurangi Reject Proses Assembly. Jurnal Teknik Industri, 18(1), 68-73. https://doi.org/10.22219/JTIUMM.Vol18.No1.68-73

Sokovic, M., Pavletic, D., & Pipan, K. K. (2010). Quality improvement methodologies–PDCA cycle, RADAR matrix, DMAIC and DFSS. Journal of achievements in materials and manufacturing engineering, 43(1), 476-483. http://jamme.acmsse.h2.pl/papers_vol43_1/43155.pdf

Sunadi, S., Purba, H. H., & Hasibuan, S. (2020). Implementation of Statistical Process Control through PDCA Cycle to Improve Potential Capability Index of Drop Impact Resistance: A Case Study at Aluminum Beverage and Beer Cans Manufacturing Industry in Indonesia. Quality Innovation Prosperity, 24(1), 104-127. https://doi.org/10.12776/QIP.V2411.1401.

Tage, P. K. S. (2018). Optimalisasi Pelaksanaan Discharge Planning Terstruktur dan Terintegrasi. CHMK Nursing Scientific Journal, 2(1), 1-10. http://cyber-chmk.net/ojs/index.php/ners/article/view/334

Tahiduzzaman, M., Rahman, M., Dey, S. K., & Kapuria, T. K. (2018). Minimization of sewing defects of an apparel industry in Bangladesh with 5S & PDCA. American Journal of Industrial Engineering, 5(1), 17-24. https://doi.org/10.12691/ajie-5-1-3.

Walasek, T. A., Kucharczyk, Z., & Morawska-Walasek, D. (2011). Assuring quality of an e-learning project through the PDCA approach. Archives of Materials Science and Engineering. 48(1), 56–61. https://journals.pan.pl/Content/89422/mainfile.pdf




DOI: http://dx.doi.org/10.22441/ijiem.v1i3.10244

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

IJIEM - Indonesian Journal of Industrial Engineering & Management
Program Pascasarjana Magister Teknik Industri Universitas Mercu Buana
Kampus Menteng - Gedung Tedja Buana, Floor 4th  
Jl. Menteng Raya No. 29  Jakarta Pusat- Indonesia
Tlp.: +62 21 31935454 Fax: +62  21 31934474
http://publikasi.mercubuana.ac.id/index.php/ijiem

Email:  [email protected]

 

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

 

Web Analytics Made Easy - Statcounter View My Stats

The journal is indexed by: