Mini Oreo Cup Production Plan with Aggregate Method to Minimize Production Costs
Abstract
Keywords
Full Text:
PDFReferences
Aris, A. R., Bakhtiar, A., & Suliantoro, H. (2014). Penerapan Sistem Make to Order serta Penjadwalan Jobshop Guna Mencegah Keterlambatan Pada Customer. Teknik Industri, 1–7.
Buffa.S.elwood. (1996). Production-Inventory System:Planning and Control. Willey Series in Production. New York.
Evans, JR, DR Anderson, DJ Sweeney, and T. W. (1990). Applied Production & Operations Management (3rd ed.). St. Paul, MN: West Publishing.
Gaspersz, V. (2011). Total Quality Management untuk Praktisi Bisnis dan Industri Cetakan ketujuh/Edisi Revisi dan Perluasan. In Vinchristo Publication.
Gasperz, V. (2017). PRODUCTION PLANNING AND INVENTORY CONTROL (7th ed.). PT. Gramedia Pustaka Utama.
Heizer, J., & R. (2015). “Manajemen Operasi Buku 1. Salemba empat.
Juliantara, I. K., & Mandala, K. (2020). Perencanaan Dan Pengendalian Produksi Agregat Pada Usaha Tedung Ud Dwi Putri Di Klungkung. E-Jurnal Manajemen Universitas Udayana, 9(1), 99. https://doi.org/10.24843/ejmunud.2020.v09.i01.p06
Meutia, S., Industri, J. T., Teknik, F., Malikussaleh, U., & Utara, A. (2019). ANALISIS PERENCANAAN JUMLAH PRODUKSI UNTUK MENINGKATKAN KEUNTUNGAN MAKSIMAL DENGAN METODE LINEAR PROGRAMMING PADA UKM MATAHARI KOTA MEDAN.
Nirwana, P., & Setyawan, W. (2019). Penerapan Metode Rencana Proses Agregat Untuk Merencanakan Jumlah Pegawai Berdasarkan Jumlah Permintaan yang Berfluktuatif. 2–3.
Reicita, F. A. (2020). Analisis Perencanaan Produksi Pada Pt. Armstrong Industri Indonesia Dengan Metode Forecasting Dan Agregat Planning. Jurnal Ilmiah Teknik Industri, 7(3), 160–168. https://doi.org/10.24912/jitiuntar.v7i3.6340
Rosero-Mantilla, C., Sánchez-Sailema, M., Sánchez-Rosero, C., & Galleguillos-Pozo, R. (2017). Aggregate Production Planning, Casestudy in a Medium-sized Industry of the Rubber Production Line in Ecuador. IOP Conference Series: Materials Science and Engineering, 212(1). https://doi.org/10.1088/1757-899X/212/1/012018
Safitri, M. D. A. (2019). Penjadwalan Produksi Untuk Meminimasi Keterlambatan DISTRIBUSI DENGAN METODE EARLIEST DUE DATE. 1, 48–55.
Sudiman, S. (2020). Peramalan Untuk Perencanaan Produksi Stop Valve Tipe Tx277S Menggunakan Metode Peramalan Deret Waktu (Time Series) Di Pt. Xyz. JITMI (Jurnal Ilmiah Teknik Dan Manajemen Industri), 3(1), 7. https://doi.org/10.32493/jitmi.v3i1.y2020.p7-14
Taylor, B. W. (2004). Introduction to Management Science (8th ed.). Prentice Hall. www.prenhall.com
DOI: http://dx.doi.org/10.22441/ijiem.v3i3.15787
Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
IJIEM - Indonesian Journal of Industrial Engineering & Management
Program Pascasarjana Magister Teknik Industri Universitas Mercu Buana
Kampus Menteng - Gedung Tedja Buana, Floor 4th
Jl. Menteng Raya No. 29 Jakarta Pusat- Indonesia
Tlp.: +62 21 31935454 Fax: +62 21 31934474
http://publikasi.mercubuana.ac.id/index.php/ijiem
Email: [email protected]
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
The journal is indexed by: