Comparative Study of RCCP and System Dynamics in Productivity Capacity

B. Handoko Purwojatmiko, Raissa Annisa Cessari, Laksmi Ambarwati, Fredy Sumasto

Abstract


One of the manufacturing companies in Indonesia which is engaged in foundry has a production line for various types of automotive components and has produced 2051 types of products. One of the products produced is the Trunion Bracket. In the molding process, cores are needed that can provide cavities in the product. The current production process has not been able to meet demand because the production cycle time does not match the predetermined time. This discrepancy will affect consumer satisfaction. Therefore, it is necessary to make a schedule for the period July to December 2022, to assist companies in facilitating the scheduling of the production process using Rough Cut Capacity Planning and System dynamics. The calculation results from Rough Cut Capacity Planning indicate that the 5th workstation experienced a shortage of production time from July to September 2022, so an additional number of working hours had to be made. The addition of the number of working hours before improvement was 367 hours and after improvement was 112 hours. Meanwhile, the results of system dynamics modeling for the period July to December 2022, require an additional working hour before improvement by 308 hours and 205 hours after improvement are carried out. The companies can implement strategies based on the results of system dynamics simulations to identify, forecast, and plan production capacity requirements for the next.

Keywords


Manufacturing; Rough-cut capacity Planning; System dynamics; Simulation

Full Text:

PDF

References


Ahmad, S., Mat Tahar, R., Muhammad-Sukki, F., Munir, A. B., & Abdul Rahim, R. (2016). Application of system dynamics approach in electricity sector modelling: A review. Renewable and Sustainable Energy Reviews, 56, 29–37. https://doi.org/10.1016/J.RSER.2015.11.034

Chandra Setiawan, I., Indarto, & Deendarlianto. (2021). Quantitative analysis of automobile sector in Indonesian automotive roadmap for achieving national oil and CO2 emission reduction targets by 2030. Energy Policy, 150, 112135. https://doi.org/10.1016/J.ENPOL.2021.112135

Cherkaoui, K., Pellerin, R., Baptiste, P., & Haït, A. (2015). A Time Driven RCCP Model with Two Levels of Planning and a Reactive Planning Approach for Tactical Project Planning. Procedia Computer Science, 64, 257–264. https://doi.org/10.1016/J.PROCS.2015.08.488

Cho, D. S. (2020). A dynamic approach to international competitiveness: The case of korea. The Competitive Advantages of Far Eastern Business, 17–36. https://doi.org/10.1201/9781315037462-2/DYNAMIC-APPROACH-INTERNATIONAL-COMPETITIVENESS-CASE-KOREA-DONG-SUNG-CHO

Dallasega, P., Rally, P., Rauch, E., & Matt, D. T. (2016). Customer-oriented Production System for Supplier Companies in CTO. Procedia CIRP, 57, 533–538. https://doi.org/10.1016/J.PROCIR.2016.11.092

Georgiadis, P. (2013). An integrated System Dynamics model for strategic capacity planning in closed-loop recycling networks: A dynamic analysis for the paper industry. Simulation Modelling Practice and Theory, 32, 116–137. https://doi.org/10.1016/J.SIMPAT.2012.11.009

Hidayat, T., Ulum, R. B., Widarman, A., Teknik, F., Jurusan, /, Industri, T., Tinggi, S., & Wastukancana, T. (2023). Rencanaan Kapasitas Produksi Pupuk Dengan Menggunakan Metode Rough Cut Capacity Planning (RCCP) Pada PT.Pupuk Kujang. Jurnal Ilmiah Multidisipilin (JUKIM), 2(4), 153–161. https://doi.org/10.56127/ju

Menezes, M. B. C., Ruiz-Hernández, D., & Verter, V. (2016). A rough-cut approach for evaluating location-routing decisions via approximation algorithms. Transportation Research Part B: Methodological, 87, 89–106. https://doi.org/10.1016/J.TRB.2016.03.003

Nasiatin, T., Adha, S., Julyanto, O., Puspita Rani, C., & Dimas, R. P. (2020). Analysis of Production Capacity Planning and Control in PT. Krakatau Wajatama With Rough Cut Capacity Planning (RCCP). Journal Industrial Engineering & Management Research (JIEMAR), 1(2), 2722–8878. https://doi.org/10.7777/jiemar.v1i2

Nurcahyo, R., & Wibowo, A. D. (2015). Manufacturing Capability, Manufacturing Strategy and Performance of Indonesia Automotive Component Manufacturer. Procedia CIRP, 26, 653–657. https://doi.org/10.1016/J.PROCIR.2014.07.046

Rebs, T., Brandenburg, M., & Seuring, S. (2019). System dynamics modeling for sustainable supply chain management: A literature review and systems thinking approach. Journal of Cleaner Production, 208, 1265–1280. https://doi.org/10.1016/J.JCLEPRO.2018.10.100

Seong, B. (2020). Smoothing and forecasting mixed-frequency time series with vector exponential smoothing models. Economic Modelling, 91, 463–468. https://doi.org/10.1016/J.ECONMOD.2020.06.020

Silva, M. H. de P. e., Costa, L. B. M., Paredes, F. J. G., Barretti, J. W., & Silva, D. A. L. (2022). The effect of demand forecasting choices on the circularity of production systems: a framework and case study. Resources, Conservation & Recycling Advances, 15, 200088. https://doi.org/10.1016/J.RCRADV.2022.200088

Sudarto, S., Takahashi, K., & Morikawa, K. (2017). Efficient flexible long-term capacity planning for optimal sustainability dimensions performance of reverse logistics social responsibility: A system dynamics approach. International Journal of Production Economics, 184, 179–192. https://doi.org/10.1016/J.IJPE.2016.12.013

Sugarindra, M., & Nurdiansyah, R. (2020). Production Capacity Optimization with Rough Cut Capacity Planning (RCCP). IOP Conference Series: Materials Science and Engineering, 722(1). https://doi.org/10.1088/1757-899X/722/1/012046

Suryani, E., Chou, S. Y., Hartono, R., & Chen, C. H. (2010). Demand scenario analysis and planned capacity expansion: A system dynamics framework. Simulation Modelling Practice and Theory, 18(6), 732–751. https://doi.org/10.1016/J.SIMPAT.2010.01.013

Wen, D., Liu, L., Wang, Y., & Zhang, Y. (2022). Forecasting crude oil market returns: Enhanced moving average technical indicators. Resources Policy, 76, 102570. https://doi.org/10.1016/J.RESOURPOL.2022.102570




DOI: http://dx.doi.org/10.22441/ijiem.v5i3.23806

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

IJIEM - Indonesian Journal of Industrial Engineering & Management
Program Pascasarjana Magister Teknik Industri Universitas Mercu Buana
Kampus Menteng - Gedung Tedja Buana, Floor 4th  
Jl. Menteng Raya No. 29  Jakarta Pusat- Indonesia
Tlp.: +62 21 31935454 Fax: +62  21 31934474
http://publikasi.mercubuana.ac.id/index.php/ijiem

Email:  [email protected]

 

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

 

Web Analytics Made Easy - Statcounter View My Stats

The journal is indexed by: