ASESMEN MATURITAS MANAJEMEN RISIKO PERUSAHAAN PADA KONTRAKTOR KECIL DAN MENENGAH
Abstract
Full Text:
PDFReferences
Badan Pusat Statistik (BPS), 2015. Kabupaten Pinrang; (online; https://pinrangkab.bps.go.id/. Diakses 7 juli 2016).
Oe, Y. (2012) Manajemen risiko proyek konstruksi (online; http://konstruksimania.blogspot.co.id/. Diakses 26 september 2016)
Tserng, HP., Yin, SYL., Dzeng, R., Wou, B., Tsai, M., Chen, W. (2009) “A Study of Ontology-Based Risk Management Framework of Construction Projects Through Project Life Cycle”, Autom Constr 18 (7):994–1008.
Burtonshaw-Gunn, S.A. (2009), “Risk And financial Management In Construction” Gower, Burlington.
Project Management Institute (PMI), 1996, “A Guide To The Project Management Body of Knowledge”, Project Management Institute, USA.
Prakoso, A. (2013) “ Analisis Penerapan Manajemen Risiko Operasional Berdasarkan Pendekatan COSO Enterprise Risk Management Pada Perusahaan Kontraktor Pertambangan Batubara Studi Kasus Di PT XYZ.
Komite nasional kebijakan governance (KNKG), 2011, “Pedoman Penerapan Manajemen Risiko Berbasis Governance” (online; https:/konsep-pedoman-penerapan-manajemen-risiko-berbasis-governance-knkg-2011.pdf. Diakses 10 september 2016)
Zhao, X., Hwang, B., G., and Low, S., P. (2015), “Enterprise Risk Management in International Construction Operations”. Springer Singapore Heidelberg New York Dordrecht London.
CAS (The Casualty Actuarial Society). “Enterprise Risk Management Committee” (2003), Overview of Enterprise Risk Management. (http://www.casact.org. Diakses 10 september 2016)
ISO (2009) Guide 73:2009, Risk Management—Vocabulary. “International Organization for Standardization”, Geneva.
Zou, P.X.W., Chen, Y., dan Chan, T.Y. (2010),”Understanding & inproving your risk management capability: assessment model for construction organizations”, Journal of Construction Engineering & Management, ASCE/August 2010, Vol 136 (8), 854-863.
Sun, M., Vidalakis, C., dan Oza, T. (2009),”A Change Management Maturity Model for Construction Project”, Proceeding of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Öngel, B. (2009),”Assessing Risk Management Maturity: A Framework for The Construction Companies”, Master Thesis, Middle East Technical University, Ankara, Turki.
Hermawan, V. (2016), “Asesmen Maturitas Manajemen Risiko Untuk Organisasi Publik Pengguna Jasa Dan Korelasinya Terhadap Kinerja” Tesis, Bandung: Universitas Katolik Parahyangan.
Taufik, J. (2015), “Model Asesmen Maturitas Manajemen Risiko Untuk Organisasi Pengguna Jasa Konstruksi Pemerintah”. Tesis, Bandung; Program Pascasarjana Teknik Sipil. Konsentrasi Manajemen Proyek Konstruksi; Universitas Katolik Parahyangan.
Zhao, X., Hwang, B., G., and Low, S., P. (2013), “Developing Fuzzy Enterprise Risk Management Maturity Model for Construction Firms”, Journal of Construction Engineering and Management, 139 (9), 1179-1189.
International Organization for Standardization (ISO). (2009), ISO 31000:2009; Risk Management-Principles & Guidelines, Geneva, Switzerland.
Ward, S., and Chapman, C. (2003), “Transforming Project Risk Management into Project Uncertainty Management”. Int J Proj Manage 21(2):97–105.
RIMS (2008), “RIMS State of ERM Report”. Risk and Insurance Management Society, New York.
Duckert, G.H. (2011), Practical Enterprise Risk Management: “A Business Process Approach. Wiley”, Hoboken, NJ.
Hopkin, P. (2010), “Fundamentals Of Risk Management”. Kogan Page, London.
Wahyudi, I. (2011), “Peran Indikator Risiko Kunci dalam Manajemen Risiko. (The Role Key Risk Indicators in Risk Management” (http://crmsindonesia.org/programs/research/ peran-indikator-risiko-kunci-dalam-manajemen-risiko-role-key-risk-indicators-risk. Diakses 25 September 2016)
Hopkinson M (2011), “The Project Risk Maturity Model: Measuring And Improving Risk Management Capability”. Gower, Burlington.
Ciorciari M, Blattner P (2008), “Enterprise Risk Management Maturity-Level Assessment Tool”. Enterprise Risk Management Symposium, 14–16 April, Chicago.
Survey Nasional Manajemen Risiko (2016), “CRMS Indonesia Center for Risk Management Studies”
DOI: http://dx.doi.org/10.22441/jtm.v6i2.1195
Refbacks
- There are currently no refbacks.
Copyright (c) 2017 Jurnal Teknik Mesin
Jurnal Teknik Mesin (JTM)
Program Studi Teknik Mesin, Fakultas Teknik, Universitas Mercu Buana
Jl. Meruya Selatan No. 01, Kembangan, Jakarta Barat 11650, Indonesia
Email: [email protected]
Telp.: 021-5840815/ 021-5840816 (Hunting)
Fax.: 021-5871335
JTM is indexed by the following abstracting and indexing services:
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.