Model ITPOSMO untuk Evaluasi E-Government: Tinjauan Studi Kasus
Abstract
Keywords
Full Text:
PDFReferences
M. Rahmatika, D. Krismawati, S. D. S. D. Rahmawati, A. Arief, D. I. D. I. Sensuse, and M. F. M. F. Dzulfikar, “An open government data maturity model: A case study in BPS-statistics Indonesia,” 2019 7th Int. Conf. Inf. Commun. Technol. ICoICT 2019, pp. 1–7, 2019, doi: 10.1109/ICoICT.2019.8835352.
D. K. Fu’Adi, A. Arief, D. I. Sensuse, and A. Syahrizal, “Conceptualizing smart government implementation in smart city context: A systematic review,” 2020, doi: 10.1109/ICIC50835.2020.9288656.
D. Napitupulu, “A Conceptual Model Of E-Government Adoption in Indonesia,” Int. J. Adv. Sci. Eng. Inf. Technol., vol. 7, no. 4, p. 1471, 2017, doi: 10.18517/ijaseit.7.4.2518.
Badan Pusat Statistik, “Rencana Strategis (Renstra) BPS 2015-2019,” Renstra, vol. 2025, 2015.
B. P. S. (BPS), “SILASTIK (Sistem Informasi Layanan Statistik),” in I, Badan Pusat Statistik (BPS), 2015.
S. Agustami and R. M. Manikam, “Perancangan Aplikasi Sistem Informasi Penyewaan Gedung Serbaguna Wilayah Jakarta Barat,” J. Ilm. FIFO, vol. XII, no. 2, pp. 149–155, 2020.
V. Jain and S. Kesar, “E-Government Implementation Challenges at Local Level: A Citizens’ Centric Perspective,” 14th Americas Conference on Information Systems (AMCIS 2008), vol. Paper 321. AIS, Toronto, ON, pp. 1–8, 2008.
Y. Alduraywish, Y. Xu, and K. Salonitis, “Evaluating state of information systems failure in developing countries using ITPOSMO model,” ICAC 2017 - 2017 23rd IEEE Int. Conf. Autom. Comput. Addressing Glob. Challenges through Autom. Comput., no. September, pp. 7–8, 2017, doi: 10.23919/IConAC.2017.8082032.
R. Heeks, “Failure, Success and Improvisation of Information Systems Projects in Developing Countries,” SSRN Electron. J., 2002, doi: 10.2139/ssrn.3477762.
H. Elkadi, “Success and failure factors for e-government projects: A case from Egypt,” Egypt. Informatics J., vol. 14, no. 2, pp. 165–173, 2013, doi: 10.1016/j.eij.2013.06.002.
R. Heeks, “e-Government in Africa: Promise and practice,” Inf. Polity Int. J. Gov. Democr. Inf. Age, vol. 7, no. 2,3, pp. 97–114, 2002.
D. Napitupulu, D. I. Sensuse, and Y. G. Sucahyo, “Sosio-technical factors of e-government implementation,” Int. Conf. Electr. Eng. Comput. Sci. Informatics, vol. 4, no. September, pp. 690–695, 2017, doi: 10.11591/eecsi.4.1095.
R. Heeks, Implementing and managing egovernment : an international text , 1st ed. London; Thousand Oaks, CA: SAGE Publications, 2005.
L. Lessa, S. Negash, and M. Belachew, “Steering e-government projects from failure to success: Using design-reality gap analysis as a mid-implementation assessment tool,” Int. Bus. Concepts, Methodol. Tools, Appl., no. January, pp. 1884–1898, 2016, doi: 10.4018/978-1-4666-9814-7.ch086.
M. Sounders, P. Lewis, and A. Thornhill, Research Methods for Business Students, vol. 7, no. September. 2016.
DOI: http://dx.doi.org/10.22441/fifo.2021.v13i2.001
Refbacks
- There are currently no refbacks.
Jurnal Ilmiah FIFO
Print ISSN: 2085-4315 | |
Online ISSN: 2502-8332 |
Sekretariat
Fakultas Ilmu Komputer
Universitas Mercu Buana
Jl. Raya Meruya Selatan, Kembangan, Jakarta 11650
Tlp./Fax: +62215871335
http://publikasi.mercubuana.ac.id/index.php/fifo
e-mail:[email protected]
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.