A Systematic Review of Kaizen Approach in Industries

Barata Sutrisno, Erry Rimawan, Tosty Maylangi Sitorus

Abstract


Today industries are currently entering the best possibility to action on rapidly changing customer needs, desires and experiences. In the environment of industries, as well as cultural competitiveness and improving market share in the global narrowing market saturation is a big concern, the concept of continuous improvement of manufacturing processes strive to the best experiences to customers has become necessary. Market competition and continuously increasing levels of service and needs for customer satisfaction have proven to be the ultimate driver of an organization's key performance continuous improvement. Adaptable Kaizen refers to sustainable continuous improvement in performance delivery, cost, and quality to a satisfied customer. This paper contribution to define research variable domination in various tools used in Kaizen concept and research variable of Kaizen dominated by VSM and Continuous Improvement with the same percentage number 21%, then Lean 18%, TPM 10%, 5S 8%, PDCA 4%, in this calculation one research paper can use more than one tools of Kaizen.

Keywords


Kaizen; PDCA; TQM; QMS; JIT

Full Text:

PDF

References


Agmoni, E. (2015). The role of Kaizen in creating radical performance results in a logistics service provider. The Role of Kaizen in Creating Radical Performance Results in a Logistics Service Provider, 12(3), 225–245. https://doi.org/10.17270/J.LOG.2016.3.4

Al-Aomar, R., & Hussain, M. (2019). Exploration and prioritization of lean techniques in a hotel supply chain. International Journal of Lean Six Sigma, 10(1), 375–396. https://doi.org/10.1108/IJLSS-10-2017-0119

Awad, M., & Shanshal, Y. A. (2017). Utilizing Kaizen process and DFSS methodology for new product development. International Journal of Quality and Reliability Management, 34(3), 378–394. https://doi.org/10.1108/IJQRM-09-2014-0139

Bortolotti, T., Boscari, S., Danese, P., Medina Suni, H. A., Rich, N., & Romano, P. (2018). The social benefits of kaizen initiatives in healthcare: an empirical study. International Journal of Operations and Production Management, 38(2), 554–578. https://doi.org/10.1108/IJOPM-02-2017-0085

Campos, V. M. K., Cotrim, S. L., Galdamez, E. V. C., & Leal, G. C. L. (2016). Introduction of Lean Manufacturing Philosophy By Kaizen Event: Case Study on a Metalmechanical Industry. Independent Journal of Management & Production, 7(1), 151–168. https://doi.org/10.14807/ijmp.v7i1.388

Chan, C. O., & Tay, H. L. (2018). Combining lean tools application in kaizen: a field study on the printing industry. International Journal of Productivity and Performance Management, 67(1), 45–65. https://doi.org/10.1108/IJPPM-09-2016-0197

Chowdhury, A. H., Shahriar, S., Hossen, T., & Mahmud, P. (2016). Reduction of Process Lead Time Using Lean Tool - Value Stream Mapping (VSM). Applied Mechanics and Materials, 860, 74–80. https://doi.org/10.4028/www.scientific.net/amm.860.74

Crema, M., Verbano, C., & Chiozza, M. L. (2015). First evidences from “lean & safety” projects. International Journal of Quality and Service Sciences, 7(2–3), 245–259. https://doi.org/10.1108/IJQSS-03-2015-0031

Dadashnejad, A. A., & Valmohammadi, C. (2018). Investigating the effect of value stream mapping on operational losses: a case study. Journal of Engineering, Design and Technology, 16(3), 478–500. https://doi.org/10.1108/JEDT-11-2017-0123

Dakhli, Z., Lafhaj, Z., & Bernard, M. (2017). Application of lean to the bidding phase in building construction: A French contractor’s experience. International Journal of Lean Six Sigma, 8(2), 153–180. https://doi.org/10.1108/IJLSS-03-2016-0010

Dave, Y., & Sohani, N. (2015). Solving the Issue of Electronic Breakdown of Hobbing Machine through Kobetsu Kaizen Methodology: A Case Study. Applied Mechanics and Materials, 789–790, 592–596. https://doi.org/10.4028/www.scientific.net/amm.789-790.592

de Almeida, J. P. L., Galina, S. V. R., Grande, M. M., & Brum, D. G. (2017). Lean thinking: planning and implementation in the public sector. International Journal of Lean Six Sigma, 8(4), 390–410. https://doi.org/10.1108/IJLSS-06-2016-0027

Džubáková, M., & Kopták, M. (2017). Work standardisation in logistics processes. Quality Innovation Prosperity, 21(2), 109–123. https://doi.org/10.12776/qip.v21i2.880

Elsheikh, A. M., Emam, M. S., & AlShareef, S. A. (2017). Bridging the gap between documents and practice in medication management “Documents Vitalization.” Business Process Management Journal, 23(4), 830–841. https://doi.org/10.1108/BPMJ-02-2017-0030

Goni, J. I. C., Tharia, F., & Suryo, N. (2018). An empirical study on relationships amongst success in benchmarking, success in Kaizen, people mindset and organizational dimensions. Benchmarking, 25(9), 3505–3518. https://doi.org/10.1108/BIJ-04-2017-0080

Gonzalez Aleu, F., & Van Aken, E. M. (2016). Systematic literature review of critical success factors for continuous improvement projects. International Journal of Lean Six Sigma, 7(3), 214–232. https://doi.org/10.1108/IJLSS-06-2015-0025

Gumba, H., Waichungo, J., Lowe, B., Mwanzu, A., Musyimi, R., Thitiri, J., … Kariuki, S. (2019). Implementing a quality management system using good clinical laboratory practice guidelines at KEMRI-CMR to support medical research. Wellcome Open Research, 3, 1–14. https://doi.org/10.12688/wellcomeopenres.14860.2

Gunduz, M., & Naser, A. F. (2017). Cost based Value Stream Mapping as a sustainable construction tool for undergraound pipeline construction projects. Sustainability (Switzerland), 9(12). https://doi.org/10.3390/su9122184

Ihsan, M., Hasanah, R., & Purba, H. H. (2019). Fanuc CNC machine damage analysis using the PDCA cycle and Kaizen implementation effort in increasing skill up operator performance in PT YPMI. Independent Journal of Management & Production, 10(1), 259. https://doi.org/10.14807/ijmp.v10i1.590

Jasti, N. V. K., Kota, S., & Sangwan, K. S. (2020). An application of value stream mapping in auto-ancillary industry: a case study. TQM Journal, 32(1), 162–182. https://doi.org/10.1108/TQM-11-2018-0165

Jayakrishna, K., Srikrishna, M., Senthilkumar, S., Vinoth Louie, A., & Kamalakannan, R. (2017). Development of Environmental Value Stream Model for Assessing Sustainability in Manufacturing. Applied Mechanics and Materials, 867, 301–306. https://doi.org/10.4028/www.scientific.net/amm.867.301

Kim, S. K. (2015). Lean initiative practice for supplier developments in Philippines. International Journal of Lean Six Sigma, 6(4), 349–368. https://doi.org/10.1108/IJLSS-12-2014-0042

Kumar, S., Dhingra, A., & Singh, B. (2018). Lean-Kaizen implementation: A roadmap for identifying continuous improvement opportunities in Indian small and medium sized enterprise. Journal of Engineering, Design and Technology, 16(1), 143–160. https://doi.org/10.1108/JEDT-08-2017-0083

Ma, J., Lin, Z., & Lau, C. K. (2017). Prioritising the enablers for the successful implementation of Kaizen in China. International Journal of Quality & Reliability Management, 34(4), 549–568. https://doi.org/10.1108/ijqrm-12-2015-0173

Matusova, D. (2016). the Improvement of Logistics Processes Through Kaizen and Six Sigma. The International Journal of Transport & Logistics, 16, 1–6. Retrieved from https://search.proquest.com/docview/1848505370?accountid=26636%0Ahttp://link.periodicos.capes.gov.br/sfxlcl41?url_ver=Z39.88-2004&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&genre=article&sid=ProQ:ProQ%3Amaterialscienceengineering&atitle=THE+IMPROVEMENT+OF+L

Musa, M. A., Kasim, N. I., Razali, A. R., Mahadzir, & Wan Saidin, W. A. N. (2015). Improvement of Overall Equipment Effectiveness (OEE) through Implementation of Autonomous Maintenance in Crankcase Line. Applied Mechanics and Materials, 761, 165–169. https://doi.org/10.4028/www.scientific.net/amm.761.165

Naidoo, L., & Mahomed, O. H. (2016). Impact of Lean on patient cycle and waiting times at a rural district hospital in KwaZulu-Natal. African Journal of Primary Health Care & Family Medicine, 8(1), e1–e9. https://doi.org/10.4102/phcfm.v8i1.1084

Nguyen, T. L. (2019). STEAM-ME: A Novel Model for Successful Kaizen Implementation and Sustainable Performance of SMEs in Vietnam. Complexity, 2019. https://doi.org/10.1155/2019/6048195

Omotayo, T. S., Boateng, P., Osobajo, O., Oke, A., & Obi, L. I. (2020). Systems thinking and CMM for continuous improvement in the construction industry. International Journal of Productivity and Performance Management, 69(2), 271–296. https://doi.org/10.1108/IJPPM-11-2018-0417

Posteucă, A., & Zapciu, M. (2015). Beyond Target Costing: Manufacturing Cost Policy Deployment for New Products. Applied Mechanics and Materials, 809–810, 1480–1485. https://doi.org/10.4028/www.scientific.net/amm.809-810.1480

Prawira, A. Y., Rahayu, Y., Hamsal, M., & Purba, H. H. (2018). A Case Study: How 5S Implementation Improves Productivity of Heavy Equipment in Mining Industry. Independent Journal of Management & Production, 9(4), 1184. https://doi.org/10.14807/ijmp.v9i4.826

Randhawa, J. S., & Ahuja, I. S. (2017a). 5S – a quality improvement tool for sustainable performance: literature review and directions. International Journal of Quality and Reliability Management, 34(3), 334–361. https://doi.org/10.1108/IJQRM-03-2015-0045

Randhawa, J. S., & Ahuja, I. S. (2017b). Evaluating impact of 5S implementation on business performance. International Journal of Productivity and Performance Management, 66(7), 948–978. https://doi.org/10.1108/IJPPM-08-2016-0154

Randhawa, J. S., & Ahuja, I. S. (2018). An investigation into manufacturing performance achievements accrued by Indian manufacturing organization through strategic 5S practices. International Journal of Productivity and Performance Management, 67(4), 754–787. https://doi.org/10.1108/IJPPM-06-2017-0149

Rodrigues, J., de Sá, J. C. V., Ferreira, L. P., Silva, F. J. G., & Santos, G. (2019). Lean management “quick-wins”: Results of implementation. A case study. Quality Innovation Prosperity, 23(3), 3–21. https://doi.org/10.12776/QIP.V23I3.1291

Sánchez-Ruiz, L., Blanco, B., & Gómez-López, R. (2019). Continuous improvement enablers: Defining a new construct. Journal of Industrial Engineering and Management, 12(1), 51–69. https://doi.org/10.3926/jiem.2743

Saravanan, V., Nallusamy, S., & George, A. (2018). Efficiency Enhancement in a Medium Scale Gearbox Manufacturing Company through Different Lean Tools - A Case Study. International Journal of Engineering Research in Africa, 34, 128–138. https://doi.org/10.4028/www.scientific.net/JERA.34.128

Satolo, E. G., Leite, C., Calado, R. D., Goes, G. A., & Salgado, D. D. (2018). Ranking lean tools for world class reach through grey relational analysis. Grey Systems: Theory and Application, 8(4), 399–423. https://doi.org/10.1108/gs-06-2018-0031

Shah, S. R., & Naghi Ganji, E. (2017). Lean production and supply chain innovation in baked foods supplier to improve performance. British Food Journal, 119(11), 2421–2447. https://doi.org/10.1108/BFJ-03-2017-0122

Singh, K., & Ahuja, I. S. (2015). An evaluation of transfusion of TQM-TPM implementation initiative in an Indian manufacturing industry. Journal of Quality in Maintenance Engineering, 21(2), 134–153. https://doi.org/10.1108/JQME-04-2013-0017

Sraun, J. S., & Singh, H. (2017). Continuous improvement strategies across manufacturing SMEs of Northern India. International Journal of Lean Six Sigma, 8(2), 225–243. https://doi.org/10.1108/ijlss-05-2016-0019

Stelson, P., Hille, J., Eseonu, C., & Doolen, T. (2017). What drives continuous improvement project success in healthcare? International Journal of Health Care Quality Assurance, 30(1), 43–57. https://doi.org/10.1108/IJHCQA-03-2016-0035

Suhardi, B., Anisa, N., & Laksono, P. W. (2019). Minimizing waste using lean manufacturing and ECRS principle in Indonesian furniture industry. Cogent Engineering, 6(1), 1–13. https://doi.org/10.1080/23311916.2019.1567019

Tan, J. J. Y., Otto, K. N., & Wood, K. L. (2017). Relative impact of early versus late design decisions in systems development. Design Science, 3, 1–28. https://doi.org/10.1017/dsj.2017.13

Thomas, A. (2018). Developing an integrated quality network for lean operations systems. Business Process Management Journal, 24(6), 1367–1380. https://doi.org/10.1108/BPMJ-02-2018-0041

Vinodh, S., Selvaraj, T., Chintha, S. K., & Vimal, K. E. K. (2015). Development of value stream map for an indian automotive components manufacturing organization. Journal of Engineering, Design and Technology, 13(3), 380–399. https://doi.org/10.1108/JEDT-08-2010-0054

Wickramasinghe, G. L. D., & Wickramasinghe, V. (2016). Effects of continuous improvement on shop-floor employees’ job performance in Lean production: The role of Lean duration. Research Journal of Textile and Apparel, 20(4), 182–194. https://doi.org/10.1108/RJTA-07-2016-0014

Xavier, A., & Gonzalez, M. D. M. (2016). Analysis and improvement of production efficiency in a construction machine assembly line. Independent Journal of Management & Production, 7(5), 606. https://doi.org/10.14807/ijmp.v7i5.453

Zarbo, R. J., Varney, R. C., Copeland, J. R., D’Angelo, R., & Sharma, G. (2015). Daily management system of the Henry Ford production system: QTIPS to Focus Continuous Improvements at the Level of the Work. American Journal of Clinical Pathology, 144(1), 122–136. https://doi.org/10.1309/AJCPLQYMOFWU31CK

Zeferino, E. B. B., Sarantopoulos, A., Spagnol, G. S., Min, L. L., & Freitas, M. I. P. de. (2019). Value Flow Map: application and results in the disinfection center. Revista Brasileira de Enfermagem, 72(1), 140–146. https://doi.org/10.1590/0034-7167-2018-0517




DOI: http://dx.doi.org/10.22441/ijiem.v3i2.14131

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

IJIEM - Indonesian Journal of Industrial Engineering & Management
Program Pascasarjana Magister Teknik Industri Universitas Mercu Buana
Kampus Menteng - Gedung Tedja Buana, Floor 4th  
Jl. Menteng Raya No. 29  Jakarta Pusat- Indonesia
Tlp.: +62 21 31935454 Fax: +62  21 31934474
http://publikasi.mercubuana.ac.id/index.php/ijiem

Email:  [email protected]

 

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

 

Web Analytics Made Easy - Statcounter View My Stats

The journal is indexed by: