Kaizen Method Implementation in Industries: Literature Review and Research Issues
Abstract
Full Text:
PDFReferences
Ahbabi, M. Al, & Alshawi, M. (2015). BIM for client organisations: A continuous improvement approach. Construction Innovation, 15(4), 402–408. https://doi.org/10.1108/CI-04-2015-0023
Arief, F. N., & Ikatrinasari, Z. F. (2018). Perbaikan Waktu Setup Dengan Menggunakan Metode Smed Pada Mesin Filling Krim. Jurnal Ilmiah Teknik Industri, 6(1), 213–220. https://doi.org/10.24912/jitiuntar.v6i1.3015
Azhar, S., & Choudhry, R. M. (2016). Capacity building in construction health and safety research, education, and practice in Pakistan. Built Environment Project and Asset Management, 6(1), 92–105. https://doi.org/10.1108/BEPAM-09-2014-0044
Aziz. (2017). 28. (Zeeshan Aziz, Rana Muhammad Qasim and Sahawneh Wajdi, 2017) Improving productivity of road surfacing operations using value stream mapping and discrete event simulation.pdf.
Bak, O. (2016). An application of the BPCM model in an e-business driven transformation agenda: Assessing resource implications for a European automotive multinational corporation (MNC). Information Technology and People, 29(2), 334–353. https://doi.org/10.1108/ITP-12-2013-0212
Bellgran, M., Kurdve, M., & Hanna, R. (2019). Cost driven green kaizen in pharmaceutical production – Creating positive engagement for environmental improvements. 81, 1219–1224. https://doi.org/10.1016/j.procir.2019.03.297
Bevilacqua, M., Ciarapica, F. E., De Sanctis, I., Mazzuto, G., & Paciarotti, C. (2015). A Changeover Time Reduction through an integration of lean practices: A case study from pharmaceutical sector. Assembly Automation, 35(1), 22–34. https://doi.org/10.1108/AA-05-2014-035
Burawat, P. (2016). Guidelines for improving productivity, inventory, turnover rate, and level of defects in manufacturing industry. International Journal of Economic Perspectives, 10(4), 88–95.
Carlucci, D., Renna, P., Izzo, C., & Schiuma, G. (2019). Assessing teaching performance in higher education: a framework for continuous improvement. Management Decision, 57(2), 461–479. https://doi.org/10.1108/MD-04-2018-0488
Dadashnejad, A. A., & Valmohammadi, C. (2018). Investigating the effect of value stream mapping on operational losses: a case study. Journal of Engineering, Design and Technology, 16(3), 478–500. https://doi.org/10.1108/JEDT-11-2017-0123
Duncan, W., Bottenberg, M., Chase, M., Chesnut, R., Clarke, C., Schott, K., … Welty, T. (2015). An industrial engineering approach to cost containment of pharmacy education. American Journal of Pharmaceutical Education, 79(9). https://doi.org/10.5688/ajpe799131
Erdogan. (2017). 13. (Sevtap Erdogan, Henry Quesada-Pineda, & Brian Bond, 2017) An Empirical Tool to Measure the Effectiveness of Kaizen Events A Case Study in the Wood Products Industries.pdf.
Feldman, G., Shah, H., Chapman, C., Pärn, E. A., & Edwards, D. J. (2017). A systematic approach for enterprise systems upgrade decision-making: Outlining the decision processes. Journal of Engineering, Design and Technology, 15(6), 778–802. https://doi.org/10.1108/JEDT-08-2017-0076
Freitas, R. de C., Freitas, M. do C. D., Gomes de Menezes, G., & Odorczyk, R. S. (2018). Lean Office contributions for organizational learning. Journal of Organizational Change Management, 31(5), 1027–1039. https://doi.org/10.1108/JOCM-06-2017-0221
Gavriluta. (2018). The Develpment of a Laboratory System t Experiment Methods to Impove The Production Flows (p. Vol. 13, 127-132). p. Vol. 13, 127-132.
Glover, W. J., Liu, W. H., Farris, J. A., & van Aken, E. M. (2013). Characteristics of established kaizen event programs: An empirical study. International Journal of Operations and Production Management, 33(9), 1166–1201. https://doi.org/10.1108/IJOPM-03-2011-0119
Hirzel, A. K., Leyer, M., & Moormann, J. (2017). The role of employee empowerment in the implementation of continuous improvement: Evidence from a case study of a financial services provider. International Journal of Operations and Production Management, 37(10), 1563–1579. https://doi.org/10.1108/IJOPM-12-2015-0780
Ikatrinasari, Z. F., Hasibuan, S., & Kosasih, K. (2018). The Implementation Lean and Green Manufacturing through Sustainable Value Stream Mapping. IOP Conference Series: Materials Science and Engineering, 453(1), 0–9. https://doi.org/10.1088/1757-899X/453/1/012004
Kanamori. (2016). 24. (Shogo Kanamori, Marcia C. Castro, 2016) Impact of the Japanese 5S management method on patients’ and caretakers’ satisfaction a quasi-experimental study in Senegal.pdf.
Karam, A. A., Liviu, M., Cristina, V., & Radu, H. (2018). The contribution of lean manufacturing tools to changeover time decrease in the pharmaceutical industry. A SMED project. Procedia Manufacturing, 22, 886–892. https://doi.org/10.1016/j.promfg.2018.03.125
Kazancoglu, Y., & Ozkan-Ozen, Y. D. (2019). Lean in higher education: A proposed model for lean transformation in a business school with MCDM application. Quality Assurance in Education, 27(1), 82–102. https://doi.org/10.1108/QAE-12-2016-0089
Khairi, S., Rahman, A., & Rushidi, K. (2016). Preface: International Conference on Recent Trends in Physics (ICRTP 2016). Journal of Physics: Conference Series, 755(1). https://doi.org/10.1088/1742-6596/755/1/011001
Khairunnas, J., Ceha, R., & Muhammad, C. (2016). Meminimasi Lead Time Produksi Menggunakan Pendekatan Lean Manufacturing di PT Indofarma ( Persero ) Tbk ( dengan Studi Kasus Kapsul Piroxicam 20 mg ). 9–18.
Khlat, M., Harb, A. H., & Kassem, A. (2014). Lean manufacturing: implementation and assessment in the Lebanese pharmaceutical industry. International Journal of Computing and Optimization, 1(2), 47–62. https://doi.org/10.12988/ijco.2014.433
Kumar, S., Dhingra, A., & Singh, B. (2018). Lean-Kaizen implementation: A roadmap for identifying continuous improvement opportunities in Indian small and medium sized enterprise. Journal of Engineering, Design and Technology, 16(1), 143–160. https://doi.org/10.1108/JEDT-08-2017-0083
Latour. (2017). 5. (Julie Charron-Latour, Samuel Bassetto, & Hugo Pourmonet, 2017) STARS the implementation of a Computer-Aided Employee Suggestion Management System to operationalize a continuous improvement process.pdf.
Leyer, M., & Moormann, J. (2014). How lean are financial service companies really? empirical evidence from a large scale study in Germany. International Journal of Operations and Production Management, 34(11), 1366–1388. https://doi.org/10.1108/IJOPM-06-2013-0296
Longoni. (2015). 18. (Annachiara Longoni, Raffaella Cagliano, 2015) Cross-functional executive involvement and worker involvement in lean manufacturing and sustainability alignment.pdf.
Maalouf, M., & Gammelgaard, B. (2016). Managing paradoxical tensions during the implementation of lean capabilities for improvement. International Journal of Operations and Production Management, 36(6), 687–709. https://doi.org/10.1108/IJOPM-10-2014-0471
McGovern, T., Small, A., & Hicks, C. (2017). Diffusion of process improvement methods in European SMEs. International Journal of Operations and Production Management, 37(5), 607–629. https://doi.org/10.1108/IJOPM-11-2015-0694
Melander, A., Löfving, M., Andersson, D., Elgh, F., & Thulin, M. (2016). Introducing the Hoshin Kanri strategic management system in manufacturing SMEs. Management Decision, 54(10), 2507–2523. https://doi.org/10.1108/MD-03-2016-0148
Nenni, M. E., Giustiniano, L., & Pirolo, L. (2014). Improvement of manufacturing operations through a lean management approach: A case study in the pharmaceutical industry. International Journal of Engineering Business Management, 6(1), 1–6. https://doi.org/10.5772/59027
Nguyen, T. L. (2019). STEAM-ME: A Novel Model for Successful Kaizen Implementation and Sustainable Performance of SMEs in Vietnam. Complexity, 2019. https://doi.org/10.1155/2019/6048195
Nordstrum, L. E., LeMahieu, P. G., & Berrena, E. (2017). Implementation Science: Understanding and finding solutions to variation in program implementation. Quality Assurance in Education, 25(1), 58–73. https://doi.org/10.1108/QAE-12-2016-0080
Petersen, K. R., Madsen, E. S., & Bilberg, A. (2016). First Lean, then modularization: improving the maintenance of offshore wind turbines. International Journal of Energy Sector Management, 10(2), 221–244. https://doi.org/10.1108/IJESM-04-2015-0006
Petrusch, N., Sieckmann, F., Menn, J. P., & Kohl, H. (2019). Integration of Active Pharmaceutical Ingredient production into a pharmaceutical Lean Learning Factory. Procedia Manufacturing, 31, 245–250. https://doi.org/10.1016/j.promfg.2019.03.039
Purba, H. H., Mukhlisin, & Aisyah, S. (2018). Productivity improvement picking order by appropriate method, value stream mapping analysis, and storage design: A case study in automotive part center. Management and Production Engineering Review, 9(1), 71–81. https://doi.org/10.24425/119402
Qassim, I. E., Reyes, J. A., & Kumar, V. (2018). Lean readiness – the case of the European pharmaceutical manufacturing industry. International Journal of Productivity and Performance Management, 67(1), 20–44. https://doi.org/10.1108/IJPPM-04-2016-0083
Rafique, M. Z., Ab Rahman, M. N., Saibani, N., Arsad, N., & Saadat, W. (2016). RFID impacts on barriers affecting lean manufacturing. Industrial Management and Data Systems, 116(8), 1585–1616. https://doi.org/10.1108/IMDS-10-2015-0427
Russell, K. W., Mone, M. C., Serpico, V. J., Ward, C., Lynch, J., Neumayer, L. A., & Nelson, E. W. (2014). Optimal utilization of a breast care advanced practice clinician. American Journal of Surgery, 208(6), 1054–1059. https://doi.org/10.1016/j.amjsurg.2014.09.007
Secchi, R., & Camuffo, A. (2016). Rolling out lean production systems: a knowledge-based perspective. International Journal of Operations and Production Management, 36(1), 61–85. https://doi.org/10.1108/IJOPM-04-2014-0194
Shokri, A., Waring, T. S., & Nabhani, F. (2016). Investigating the readiness of people in manufacturing SMEs to embark on Lean Six Sigma projects: An empirical study in the German manufacturing sector. International Journal of Operations and Production Management, 36(8), 850–878. https://doi.org/10.1108/IJOPM-11-2014-0530
Shurrab, J., & Hussain, M. (2018). An empirical study of the impact of lean on the performance of the construction industry in UAE. Journal of Engineering, Design and Technology, 16(5), 694–710. https://doi.org/10.1108/JEDT-09-2017-0095
Sieckmann, F., Ngoc, H. N., Helm, R., & Kohl, H. (2018). Implementation of lean production systems in small and medium-sized pharmaceutical enterprises. Procedia Manufacturing, 21(2017), 814–821. https://doi.org/10.1016/j.promfg.2018.02.188
Sweis, G. J., Hiyassat, M., & Al-Hroub, F. F. (2016). Assessing lean conformance by frst-grade contractors in the Jordanian construction industry. Construction Innovation, 16(4), 446–459. https://doi.org/10.1108/CI-04-2015-0024
Szymanska-bralkowska, M., & Jankow, M. (2012). Implementation of green lean. 5(1), 155–162.
Tetteh, H. A. (2012). Kaizen: A Process Improvement Model for the Business of Health Care and Perioperative Nursing Professionals. AORN Journal, 95(1), 104–108. https://doi.org/10.1016/j.aorn.2011.11.001
Timans, W., Antony, J., Ahaus, K., & Van Solingen, R. (2012). Implementation of Lean Six Sigma in small- and medium-sized manufacturing enterprises in the Netherlands. Journal of the Operational Research Society, 63(3), 339–353. https://doi.org/10.1057/jors.2011.47
Vinodh. (2012). 19. (S. Vinodh, T. Selvaraj, Suresh Kumar Chintha and Vimal K.E.K, 2012) Development of value stream map for an Indian automotive components manufacturing organization.pdf.
Ward. (2018). 7. (Cassandra S. Ward, Amy Andrade, & Lena Walker- Winfree, 2018) Implementing a Course Review Process for a Continuous Quality Improvement Model for a Medical School Curriculum.pdf.
Zahra, L. (2015). Use of the Lean Concept to Increase The Efficiency of Pharmaceutical Installation Service In Hospital Anna Medika Bekasi. 1, 29–42.
Zhang, A., Luo, W., Shi, Y., Chia, S. T., & Sim, Z. H. X. (2016). Lean and Six Sigma in logistics: a pilot survey study in Singapore. International Journal of Operations and Production Management, 36(11), 1625–1643. https://doi.org/10.1108/IJOPM-02-2015-0093
DOI: http://dx.doi.org/10.22441/ijiem.v3i2.15408
Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
IJIEM - Indonesian Journal of Industrial Engineering & Management
Program Pascasarjana Magister Teknik Industri Universitas Mercu Buana
Kampus Menteng - Gedung Tedja Buana, Floor 4th
Jl. Menteng Raya No. 29 Jakarta Pusat- Indonesia
Tlp.: +62 21 31935454 Fax: +62 21 31934474
http://publikasi.mercubuana.ac.id/index.php/ijiem
Email: [email protected]
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
The journal is indexed by: