Risk Identification in Residential Construction Project: A Systematic Literature Review
Abstract
Keywords
Full Text:
PDFReferences
Aarthipriya, V., Chitra, G., & Poomozhi, J. S. (2020). Risk and its impacts on time and cost in construction projects. Journal of Project Management, 5, 245–254. https://doi.org/10.5267/j.jpm.2020.6.002
Abdulrahman, M. (2019). Risk Analysis and Control in Construction Industry ( Residential Complexes in Iraq ). International Journal of Civil Engineering and Technology, 10(07), 153–161. https://papers.ssrn.com/sol3/papers.cfm?abstract_id=3451007
Arief, M., & Latief, Y. (2021). Project planning system improvement in residential development project: A risk analysis. IOP Conference Series: Materials Science and Engineering, 1098(2), 022032. https://doi.org/10.1088/1757-899x/1098/2/022032
Azarova, I. (2015). The main aspects of the value-oriented management of investment and construction housing projects. Magazine of Civil Engineering, 59(7), 18–29. https://doi.org/10.5862/MCE.59.2
Badawy, M., Alqahtani, F., & Hafez, H. (2022). Identifying the risk factors affecting the overall cost risk in residential projects at the early stage. Ain Shams Engineering Journal, 13(2), 101586. https://doi.org/10.1016/j.asej.2021.09.013
Bhadane, N., Kunte, B., Manure, J., & Salunkhe, K. (2021). A Study on Qualitative Risk Analysis in Residential Building Construction Project. International Research Journal of Engineering and Technology (IRJET), 8(6), 3413–3418. www.irjet.net
Dusane, P. M. M., & Bhangale, P. P. P. (2014). Assessment of Risk and Its Application for Residential Construction Projects : A Case Study. Department of Civil Engineering, MET’s IOT-Polytechnic, Nashik, India, 3(9), 1067–1072.
Eric Cahyadi Halim, Andi, J. R. (2021). Aplikasi Interpretive Structural Modeling (ISM) Pada Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Di Surabaya. Dimensi Utama Teknik Sipil, 8(1), 60–77. https://doi.org/10.9744/duts.8.1.60-77
Fergany, M., Badawy, M., & El-Nawawy, O. (2019). Risk assessment Model for Residential Construction Projects. Al-Azhar University Civil Engineering Research Magazine, 41(3), 328–337.
Fernández-Valderrama, P., Moyano, J. J., & Chaza, M. R. (2019). Risk management of post-construction costs in residential rental buildings. Informes de La Construccion, 71(555). https://doi.org/10.3989/ic.63759
Gurcanli, G. E., Bilir, S., & Sevim, M. (2015). Activity based risk assessment and safety cost estimation for residential building construction projects. Safety Science, 80(112), 1–12. https://doi.org/10.1016/j.ssci.2015.07.002
Haq, R. U. (2019). Proposed Method for Risk Management of Small Size Residential Housing Construction Projects – A Case Study. National University of Science and Technology, Islamabad, Pakistan., 1–9.
Hedaoo, N., & Pawar, A. (2021). Risk Assessment Model Based on Fuzzy Logic for Residential Buildings. Slovak Journal of Civil Engineering, 29(4), 37–48. https://doi.org/10.2478/sjce-2021-0026
Hendradewa, A. P. (2019). Schedule Risk Analysis by Different Phases of Construction Project Using CPM-PERT and Monte-Carlo Simulation. IOP Conference Series: Materials Science and Engineering, 528(1). https://doi.org/10.1088/1757-899X/528/1/012035
Hosein, G., & Ray, I. (2020). Priority Analysis of pre-Investment Risks. Cogent Engineering, 7(1). https://doi.org/10.1080/23311916.2020.1757183
Isaza-Restrepo, P. A., Martínez Carvajal, H. E., & Hidalgo Montoya, C. A. (2016). Methodology for quantitative landslide risk analysis in residential projects. Habitat International, 53, 403–412. https://doi.org/10.1016/j.habitatint.2015.12.012
Juri, D., & Brajkovi, D. (2010). THE PROJECT FINANCE MODEL IN THE SUPPLY OF RESIDENTIAL AND COMMERCIAL PREMISES. Centre for Business Finance Management d.o.o., Rijeka, 181–206.
Kerzner, H. (2017). Project management : a systems approach to planning, scheduling, and controlling (Twelfth ed). John Wiley & Sons, Inc.
Khaleel, T. A., & Flayeh, M. A. (2020). Evaluation of risk factors affecting the implementation time for residential complex projects in Iraq. IOP Conference Series: Materials Science and Engineering, 671(1). https://doi.org/10.1088/1757-899X/671/1/012002
Lee, S., Lee, S., & Kim, J. (2018). Evaluating the impact of defect risks in residential buildings at the occupancy phase. Switzerland, 10(12), 8–11. https://doi.org/10.3390/su10124466
Li, Y., & Ellingwood, B. R. (2009). Framework for Multihazard Risk Assessment and Mitigation for Wood-Frame Residential Construction. Journal of Structural Engineering, 135(2), 159–168. https://doi.org/10.1061/(asce)0733-9445(2009)135:2(159)
Ling Jia, Queena K. Qian, Frits Meijer, H. V. (2021). Exploring key risks of energy retrofit of residential buildings in China with transaction cost considerations. Elsevier Ltd.
Lopez del Puerto, C., Clevenger, C. M., Boremann, K., & Gilkey, D. P. (2014). Exploratory Study to Identify Perceptions of Safety and Risk among Residential Latino Construction Workers as Distinct from Commercial and Heavy Civil Construction Workers. Journal of Construction Engineering and Management, 140(2), 04013048. https://doi.org/10.1061/(asce)co.1943-7862.0000794
Mahendra, P. A., Pitroda, P. J., & Bhavsar, P. J. J. (2014). Risk Assessment in Residential Construction Projects by SPSS. INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY, 3(5). http://www.ijesrt.com/issues%2520pdf%2520file/Archives-2014/May-2014/82.pdf
Mehta, S., Shah, K., Mishra, A., Mehta, S., & Pawar, A. (2019). Risk Assessment of a Residential Complex using Fuzzy Logic Approach. Thakur College of Engineering &Technology, Mumbai, India, 6(3), 21–27.
Mishra, A., & Mallik, K. (2017). Factors and Impact of Risk Management Practice on Success of Construction Projects of Housing Developers, Kathmandu. International Journal of Sciences: Basic and Applied Research (IJSBAR), 4531(December), 206–232.
Murtala, A. L., Opeyemi, J., Korede, A. C., Owoicho, O. I., & Jide, A. (2013). ECONOMETRIC ENTROPY- NEURAL NETWORK-BASED MODEL FOR PROJECT COST ADJUDICATION SYSTEM IN RESIDENTIAL BUILDING. International Journal of Education and Research, 1(2).
Na Ayudhya, B. I., & Kunishima, M. (2017). Risks of Abandonment in Residential Projects Caused by Subcontractors. Procedia Computer Science, 121, 232–237. https://doi.org/10.1016/j.procs.2017.11.032
Na Ayudhya, B. I., & Kunishima, M. (2019). Assessment of Risk Management for Small Residential Projects in Thailand. Procedia Computer Science, 164, 407–413. https://doi.org/10.1016/j.procs.2019.12.200
Pereira, L., Ferreira, S., & Santos, J. (2020). The main causes of risk in residential real estate projects. Journal of General Management, 45(3), 152–162. https://doi.org/10.1177/0306307019890095
Petr, R. (2017). Risk Management in Construction Projects. Journal of Engineering and Applied Sciences, 5347–5352.
Phadtare, M. T., Gosavi, A. D., & Ganguli, T. K. (2018). Risk management in small and micro construction firms undertaking repairs and modernisation of residential houses: A case of India. International Journal of Risk Assessment and Management, 21(3), 184–204. https://doi.org/10.1504/IJRAM.2018.093742
Phawchamnan, P., & Nathapindhu, G. (2018). Factors associated with accidents among residential construction workers in Udon Thani Province, Thailand. Journal of Public Health and Development, 16(2), 29–39.
Prakash, A. A., Manikanta, D. K. N., & Prabhu, S. M. (2017). Risk assessment of residential buildings in indian construction industry by application of fuzzy. International Journal of Civil Engineering and Technology, 8(4), 884–894.
Razali, M. N., & Manaf, Z. (2014). the Management of Property Development Risks in Malaysia - Risk Management and the Property Development Process: a Review. Department of Construction and Real Estate Management Kolej University Teknologi Tun Hussein Onn, Johor Malaysia, June. https://doi.org/10.15396/eres2006_183
Rumimper, R. R. (2015). Analisis Resiko Pada Proyek Konstruksi Perumahan Di Kabupaten Minahasa Utara. Jurnal Ilmiah Media Engineering, 5(2), 381–389.
Shahapur, R. N., & Balasaheb, P. (2016). Risk management practices in real estate projects. International Journal for Scientific Research & Development, 4(06), 556–558.
Simanjuntak, M., & Salim, A. (2020). ANALISIS PILOT PROJECT RISIKO KETERLAMBATAN PROYEK PADA BANGUNAN GEDUNG TINGGI HUNIAN. SNITT- Politeknik Negeri Balikpapan, 401–410.
Subramanian, D., Salazar, J., Duenas-Osorio, L., & Stein, R. (2014). Building and Validating Geographically Refined Hurricane Wind Risk Models for Residential Structures. Natural Hazards Review, 15(3), 04014002. https://doi.org/10.1061/(asce)nh.1527-6996.0000130
Tiwari, S., Sakale, R., & Singh, H. P. (2019). Experimental Study on: “Risk Management in Residential Building Project.” International Journal of Trend in Scientific Research and Development, Volume-3(Issue-2), 815–821. https://doi.org/10.31142/ijtsrd21500
Wali, K. I., & Othman, S. A. (2019). Schedule Risk Analysis Using Monte Carlo Simulation for Residential Projects. Zanco Journal of Pure and Applied Sciences, 31(5). https://doi.org/10.21271/zjpas.31.5.11
Walsh, K. D., Bashford, H. H., Sawhney, A., & Witjakso, A. (2004). Cost of Risk Transfer: Pricing Agreements in Residential Supply Chains. Journal of Architectural Engineering, 10(3), 112–118. https://doi.org/10.1061/(asce)1076-0431(2004)10:3(112)
Wang, Y. Q., Bian, G. Y., & Li, Y. (2014). Risk assessment of construction organization plans for bridge projects. Advanced Materials Research, 831, 370–375. https://doi.org/10.4028/www.scientific.net/AMR.831.370
DOI: http://dx.doi.org/10.22441/ijiem.v3i2.15484
Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
IJIEM - Indonesian Journal of Industrial Engineering & Management
Program Pascasarjana Magister Teknik Industri Universitas Mercu Buana
Kampus Menteng - Gedung Tedja Buana, Floor 4th
Jl. Menteng Raya No. 29 Jakarta Pusat- Indonesia
Tlp.: +62 21 31935454 Fax: +62 21 31934474
http://publikasi.mercubuana.ac.id/index.php/ijiem
Email: [email protected]
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
The journal is indexed by: