Abstract


PT XYZ is the largest cement manufacturer in Indonesia that produces cement with different types of cement, namely OPC, PCC, and PPC. The implementation of its production process, starts with the mixing of raw materials, processing, and packaging to the finished product, namely cement. PT XYZ has a problem in the form of raw material inventory that has not been well controlled because the raw materials are often placed outside the storage area provided by the company due to overloading, thus taking up space that should not be used as a raw material storage area. In this study, the minimum-maximum method is applied to 4 types of raw materials, silica sand, gypsum, trass, and fly ash. By determining the amount of safety stock, minimum stock, maximum stock, reorder point and order quantity, companies can effectively determine the raw material inventory policy to avoid overstock or stockout. The study uses a 99% service level with a 1% risk of out-of-stock products. The results of the study obtained the safety stock value of silica sand 3,854 tons; gypsum 4,405 tons; trass 10,456 tons; and Fly Ash 511 tons. Then, the minimum inventory calculation is carried out, it is known that the minimum inventory results are in Fly ash raw material of 776 tons while the results for maximum inventory are in Trass of 34,613 tons. After the min-max calculation, the ordering policy for each material can be obtained, silica sand 5,255 tons, gypsum 9,111 tons, trass 22,534 tons, fly ash 776 tons.

Keywords


Inventory control, Min-Max method, Raw material, Safety stock

Full Text:

PDF

References


Alynardina, G. E., & Saifi, M. (2017). Analisis Perencanaan Persediaan Bahan Baku Menggunakan Metode Economic Order Quantity (EOQ) (Studi Kasus pada PT. Semen Indonesia (Persero) Tbk Pabrik Tuban). Jurnal Administrasi Bisnis, 49(1), 17–25.

Angelina, C. F., Atmaji, F. T. D., & Santosa, B. (2020). Spare Part Requirement and Inventory Policy for Rovema’s 1 Machine Using Reliability Centered Spare (RCS) and Min-Max Stock Methods. IOP Conference Series: Materials Science and Engineering, 722(1), 1–14. https://doi.org/10.1088/1757-899X/722/1/012017

Bunga, W. A. Y., & Rinawati, D. I. (2019). Perencanaan Persediaan Bahan Baku Semen dengan Menggunakan Metode Material Requirement Planning (MRP) pada PT Indocement Tunggal Prakarsa Tbk. Plant Cirebon. Industrial Engineering Online Journal, 7(4).

Chamidah, N., & Auliandri, T. A. (2019). Analisis Persediaan Bahan Baku Produksi Beton dengan Metode Material Requirement Planning (MRP) pada PT. Merak Jaya Beton Plant Kedung Cowek Surabaya. Jurnal Inovasi Bisnis Dan Manajemen Indonesia, 02(04), 505-512.

Fithri, P., Hasan, A., & Asri, F. M. (2019). Analysis of Inventory Control by Using Economic Order Quantity Model – A Case Study in PT Semen Padang. Jurnal Optimasi Sistem Industri, 18(2), 116–124. https://doi.org/10.25077/josi.v18.n2.p116-124.2019

Hendradewa, A. P., & Aditiyana, M. I. (2022). Analisis Pengendalian Persediaan Bahan Baku Menggunakan Metode Min-Max Stock pada Produk Semen Bima (Studi Kasus: PT Sinar Tambang Arthalestari). Jurnal DISPOROTEK, 13(2), 146–153. https://doi.org/10.34001/jdpt.v12i2

Humaidy, M. I. (2022). Perancangan Sistem Stock Opname Bahan Baku Resep Bolu Menggunakan Metode Min-Max Stock. Jurnal Sains Dan Teknologi Informasi, 1(3), 73–78.

Indarti, T. R., Satibi, & Yuniarti, E. (2019). Pengendalian Persediaan Obat dengan Minimum-Maximum Stock Level di Instalasi Farmasi RSUP Dr. Sardjito Yogyakarta. Jurnal Manajemen Dan Pelayanan Farmasi, 9(3), 192–202. https://doi.org/10.22146/jmpf.45295

Indrawan, S., Suarlin, J., & Sirlyana. (2022). Penerapan Peramalan Produksi Produk Semen di PT XYZ Guna Memenuhi Permintaan Konsumen. Jurnal Aplikasi Rancangan Teknik Industri, 17(1), 91–97.

Kumari, K. P., & Jagadeeswaran, S. (2018). A Study on Inventory Control Techniques in Apparel Industry. International Journal of Research and Review, 5(2), 61–66.

Mail, A., Asri, M., Padhil, A., A., T., & Chairany, N. (2018). Pengendalian Persediaan Bahan Baku Menggunakan Metode Min-Max Stock dI PT. Panca Usaha Palopo Plywood. Journal of Industrial Engineering Management, 3(1), 9–14.

Pitriyani, Martaseli, E., & Kartini, T. (2021). Analisis Sistem Akuntansi Persediaan Bahan Baku Dalam Mengendalikan Persediaan. INVENTORY: Jurnal Akuntansi, 5(2), 135–143. https://doi.org/http://doi.org/10.25273/inventory.v5i2.10655

Purnama, D. H. D., & Pulansari, F. (2020). Perencanaan dan Pengendalian Bahan Baku Produksi Kerupuk dengan Metode MRP untuk Meminimumkan Biaya Persediaan Bahan Baku di UD. XYZ. Jurnal Manajemen Indutri Dan Teknologi, 01(04), 49–57.

Rachmawati, N. L., & Lentari, M. (2022). Penerapan Metode Min-Max untuk Minimasi Stockout dan Overstock Persediaan Bahan Baku. Jurnal INTECH Teknik Industri Universitas Serang Raya, 8(2), 143–148. https://doi.org/http://dx.doi.org/10.30656/intech.v8i2.4735

Setiawan, A., Pulansari, F., & Sumiati. (2020). Pengukuran Kinerja dengan Metode Supply Chain Operations Reference (SCOR) (Studi Kasus PT. XYZ). Jurnal Manajemen Industri Dan Teknologi, I(1), 55–66. http://juminten.upnjatim.ac.id/index.php/juminten

Suhartini, & Basjir, M. (2018). Pengendalian Persediaan Bahan Baku Produk LP 29 B-Stylish GT dengan Pendekatan Material Requirement Planning Berdasarkan Silver-Meal dan Part-Period Balancing. Journal of Industrial and Systems Optimization, 1(1), 47–55.

Suseno, & Siswoko, A. P. D. (2022). Analisis Penerapan Metode Silver Meal dan Min Max dalam Pengendalian Persediaan Bahan Baku yang Ekonomis (Studi Kasus pada Perumda Air Minum Tirta Binangun). Teknosains: Media Informasi Sains Dan Teknologi, 16(3), 283–290. https://doi.org/https://doi.org/10.24252/teknosains.v16i3.26963

Wali, M. (2019). Application Optimizing the Placement of Safety Stocks Using the Max-Min Method for Printing Companies. International Journal of Research and Review, 6(2), 203–210.




DOI: http://dx.doi.org/10.22441/ijiem.v4i3.20953

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

IJIEM - Indonesian Journal of Industrial Engineering & Management
Program Pascasarjana Magister Teknik Industri Universitas Mercu Buana
Kampus Menteng - Gedung Tedja Buana, Floor 4th  
Jl. Menteng Raya No. 29  Jakarta Pusat- Indonesia
Tlp.: +62 21 31935454 Fax: +62  21 31934474
http://publikasi.mercubuana.ac.id/index.php/ijiem

Email:  [email protected]

 

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

 

Web Analytics Made Easy - Statcounter View My Stats

The journal is indexed by: