Implementation of Lean Manufacturing Approach Using Value Stream Mapping to Optimize Cycle Time and Reduce Process Waste (Case Study: CV. Teguh Jaya Mandiri)
Abstract
Keywords
References
Batako, A., dkk. 2022. Advances in Manufacturing Processes, Intelligent Methods and Systems in Production Engineering: Progress in Application of Intelligent Methods and Systems in Production Engineering. New York: Springer International Publishing.
Benzon, H.M.D., dkk. 2022. Practical Management of Pain E-Book. Amsterdam: Elsevier Health Sciences.
Johan, A., & Soediantono, D. (2022). Literature Review of the Benefits of Lean Manufacturing on Industrial Performance and Proposed Applications in the Defense Industries. Journal of Industrial Engineering & Management Research, 3(2), 13–23. https://www.jiemar.org/index.php/jiemar/article/view/272.
Khunaifi, A., Rangga Primadasa, & Sugoro Bhakti Sutono. (2022). Implementation of Lean Manufacturing to Minimize Waste using the Value Stream Mapping Method at PT. Pura Barutama. Journal of Industrial Engineering (JRI), 4(2), 87–93. https://doi.org/10.37631/jri.v4i2.560.
Komariah, I. (2022). Application of Lean Manufacturing to Identify Waste in the Production of Wok Using Value Stream Mapping (VSM) at Primajaya Aluminum Industry Company in Ciamis. Journal of Media Technology, 8(2), 109–118. https://doi.org/10.25157/jmt.v8i2.2668
Maulana, Y. (2019). Identification of Waste using the Value Stream Mapping Method in the Housing Industry. Journal of Industrial Engineering and Operation Management, 2(2), 12–19. https://doi.org/10.31602/jieom.v2i2.2934.
Ridwan, A., Arina, F., & Permana, A. (2020). Quality and Efficiency Improvement in Dunnage Production Process using Lean Six Sigma Method (Case Study at PT. XYZ). Teknika: Journal of Science and Technology, 16(2), 186. https://doi.org/10.36055/tjst.v16i2.9618
Riyadi, M. (2020). Production Control in the Shipyard Industry. Sukabumi: CV Jejak (Jejak Publisher).
Rizki, M., & Saputra, A. (2022). Risk Analysis of Supply Chain Management using Grey Failure Mode and Effect Analysis and Root Cause Analysis at PT Pertamina Fuel Terminal Meulaboh. Serambi Engineering Journal, 7(1), 2783–2790. https://doi.org/10.32672/jse.v7i1.3888.
Rochmah, S. (2022). Textbook of Operations Management 1. Pekalongan: NEM Publisher.
Rozaq, A. M., Asmoro, E. I., et al. (2019). Application of Lean with VSM and Lean Assessment in the Manufacture of Type C Trucks for Waste Identification. Proceedings of SENDI_U, 978–979.
Siti Feriani Rochimah, A. A. M. (2020). Critical Waste in the Outpatient Pharmacy Installation of RSUP dr. Soeradji Tirtonegoro: Lean Management Approach. Environmental Occupational Health and Safety Journal, Vol 1 No 1, 81–100. [nomor DOI ?]
DOI: http://dx.doi.org/10.22441/ijiem.v5i2.22440
Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
IJIEM - Indonesian Journal of Industrial Engineering & Management
Program Pascasarjana Magister Teknik Industri Universitas Mercu Buana
Kampus Menteng - Gedung Tedja Buana, Floor 4th
Jl. Menteng Raya No. 29 Jakarta Pusat- Indonesia
Tlp.: +62 21 31935454 Fax: +62 21 31934474
http://publikasi.mercubuana.ac.id/index.php/ijiem
Email: [email protected]
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
The journal is indexed by: