Proposed Total Productive Maintenance (TPM) Implementation to Increase Heading Machine Effectiveness Using Overall Equipment Effectiveness (OEE) Method on PT. XYZ

Rupertus Mario Serapion Leke, Joumil Aidil Saifuddin

Abstract


PT XYZ is one of the companies engaged in the precast concrete manufacturing industry which is specially designed to meet the needs of industrial markets such as high-quality building and building construction. The machine under study is the machine used for assembling the spun pile reinforcement frame in the rotary workshop. The purpose of this study is to analyze the application of Total Productive Maintenance (TPM) through the effectiveness and efficiency of heading machine performance and analyze the factors that affect the Overall Equipment Effectiveness (OEE) value and present a proposed heading machine maintenance strategy. The method used is OEE with Six Big Losses analysis. For the analysis of the six big losses on the OEE value, namely the value of Idle and minor stoppage (a decrease due to many machine stops) which is a factor that has the largest percentage of the six big losses with a resulting factor value of 7.0%. Then followed by reduced speed losses (decrease in engine speed) of 3.96% and then deffect losses of 3.48% and the three other factor values, namely breakdown losses, setup losses, and yield losses. Measurement of the level of effectiveness and efficiency of the heading machine at PT XYZ using the OEE method for the period 2022 in January - December obtained an average value of 78.28%. The resulting value is still far from the ideal OEE standard value of 85% which refers to the world class standard. The lowest OEE factor value is obtained from the calculation of Performance Efficiency of 86.29% where it is necessary to update the machine maintenance scheduling so as to increase the efficiency of the heading machine performance that supports the production speed of the company.

Keywords


TPM; OEE; Six big losses; Maintenance; Performance efficiency

Full Text:

PDF

References


Andayati, D. (2019). Sistem Informasi Produksi Untuk Meningkatkan Kualitas Sistem Manufaktur Dan Jasa Dina. Jurnal Teknologi Dan Manajemen, 12(1), 87–92.

B. G. Sitompul, & D. I. Rinawati. (2019). Analisis Overall Equipment Effectiveness (Oee) Pada Mesin Digester Dan Pendekatan 5 Whys Untuk Perbaikan Pada PT Toba Pulp Lestari,Tbk. (Studi Kasus PT Toba Pulp Lestari,Tbk.). Industrial Engineering Online Journal, 8(1). https://ejournal3.undip.ac.id/index.php/ieoj/article/view/23258

Chair, R. D. (2022). Analisis Keefektifan Mesin Pellet 4 Menggunakan Metode Oee Dan Six Big Losses Di PT. Charoen Pokphand Indonesia. http://repository.upnjatim.ac.id/8395/

Dipa, M., Dewi Lestari, F., Faisal, M., & Fauzi, M. (2022). Analisis Overall Equipment Effectiveness (OEE) Dan Six Big Losses Pada Mesin Washing Vial di PT. XYZ. Junal Ilmiah Statistika Dan Ekonometrika, 2(1), 61–75. doi.org/10.46306/bay.v2i1.29

Haryono, S. (2019). Manajemen Produksi & Operasi. In Journal of Chemical Information and Modeling.

Marfinov, B. F. P. A., & Pratama, A. J. (2020). Overall Equipment Effectiveness (OEE) Analysis to Minimize Six Big Losses in Continuous Blanking Machine. IJIEM - Indonesian Journal of Industrial Engineering and Management, 1(1), 25. https://doi.org/10.22441/ijiem.v1i1.8037

Muhajir, S. M., & Yuamita, F. (2023). Analisis Total Productive Maintenance Dengan Menggunakan Metode Overall Equipment Effectiveness Pada Mesin Mixing Batching di PT. Wijaya Karya Beton Tbk Boyolali. Jurnal Inovasi Dan Kreativitas, 3(1), 9. https://doi.org/10.30656/jika.v3i1.6048

Nursanti, E., Avief, R. M. S., Sibut, & Kertaningtyas, M. (2019). Maintenance Capacity Planning. Dream Litera Buana.

Pranowo, I. D. (2019). Sistem dan Manajemen Pemeliharaan.

Rifandi, I. F. (2020). Analisis Pemeliharaan Mesin dengan Menggunakan Metode Preventive dan Breakdown Maintenance dalam Rangka Meminimumkan Biaya Pemeliharaan pada Mesin Boiler di Pabrik Gondorukem dan Terpentin Sindangwangi. Prosiding Manajemen, 544–548.

Setiawan, B., Latif, F. Al, & Rimawan, E. (2022). Overall Equipment Effectiveness ( OEE ) Analysis : A Case Study in the PVC Compound Industry. IJIEM (Indonesian Journal of Industrial Engineering & Management), 3(1), 14–25. http://dx.doi.org/10.22441/ijiem.v3i1.12066

Siddiq, M., Atmaji, F. T. D., & Alhilman, J. (2018). Usulan Penerapan Total Productive Maintenance (TPM) untuk Meningkatkan Efektivitas Mesin dengan Menggunakan Metode Overall Equipment Effectiveness (OEE). EProceedings 5(2), 2982-2990.

Simanjuntak, A. W. P. (2020). Studi Penerapan Total Productive Maintenance (TPM) Untuk Peningkatan Efisiensi Pada Pabrik Pupuk Organik PT. Agro Energi Indonesia.

Vianty, K. D. O., Hutabarat, J., & ST. Salmia L. A. (2022). Analisis Overall Equipment Effectiveness Untuk Meningkatkan Producktivitas Cup Filling Machine Melalui Pendekatan Six Big Losses. Jurnal Valtech (Jurnal Mahasiswa Teknik Industri), 5(1), 50–57. https://ejournal.itn.ac.id/index.php/valtech/article/view/4502

Wibisono, D. (2021). Analisis Overall Equipment Effectiveness (OEE) Dalam Meminimalisasi Six Big Losses Pada Mesin Bubut (Studi Kasus di Pabrik Parts PT XYZ). Jurnal Optimasi Teknik Industri (JOTI), 3(1), 7–13. https://doi.org/10.30998/joti.v3i1.6130

Widat, S., Awalina, D. N., & Mufidah, K. M. (2021). Analisis Kegiatan Pemeliharaan Mesin Dan Bangunan Pada Pabrik Tahu Untuk Meminimumkan Biaya Saat Pandemi Covid-19. JEPS: Journal of Economics and Policy Studies, 02(02), 63-74. https://doi.org/10.21274/jeps.v2i2.5350




DOI: http://dx.doi.org/10.22441/ijiem.v5i2.23832

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

IJIEM - Indonesian Journal of Industrial Engineering & Management
Program Pascasarjana Magister Teknik Industri Universitas Mercu Buana
Kampus Menteng - Gedung Tedja Buana, Floor 4th  
Jl. Menteng Raya No. 29  Jakarta Pusat- Indonesia
Tlp.: +62 21 31935454 Fax: +62  21 31934474
http://publikasi.mercubuana.ac.id/index.php/ijiem

Email:  [email protected]

 

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

 

Web Analytics Made Easy - Statcounter View My Stats

The journal is indexed by: