Comparative Analysis of Repair Policy and Preventive Maintenance Policy Methods in Machine Maintenance on the Production Floor of PT. Metro Riau
Abstract
Keywords
Full Text:
PDFReferences
Atikno, W., Wijaya, E. O., Setiawan, I., Susanto, R., & Kurnia, H. (2022). Analysis of BTA16 CNC Machine Performance Improvement with Total Productive Maintenance Approach. IJIEM - Indonesian Journal of Industrial Engineering and Management, 3(3), 200. https://doi.org/10.22441/ijiem.v3i3.15770
Azizah, N. B., Indriati, S., Widuri, R., & Shaferi, I. (2021). Analisis Repair Maintenance Policy Dan Preventive Maintenance Policy Untuk Meminimalkan Total Maintenance Cost Pada Mesin Pleating Pt Duta Nichirindo Pratama. Jurnal Ekonomi, Bisnis, Dan Akuntansi, 22(4), 404–420. https://doi.org/10.32424/jeba.v22i4.1765
Daniel, M. Y., Trismaya, N., Pardede, R. M., Handoko, A., Tinggi, S., & Interstudi, D. (2023). Perancangan Ulang Desain Website Cv. Multi Karya Indonesia Dengan Prototype User Interface (Ui) Sebagai Media Utama. 3(1), 455–474. https://doi.org/http://dx.doi.org/10.33376/jdes.v3i1.2107
Duwi, Y., Astuti, C. W., & Munifah, S. (2022). Kalimat Efektif Pada Kolom Berita Koran Seputar Ponorogo Bulan Februari-Mei 2021. Jurnal Pendidikan Bahasa Dan Sastra Indonesia, 2(1), 42–48. https://jurnal.stkippgriponorogo.ac.id/index.php/Leksis/article/view/165
Fikri, M. El, Pane, D. N., & Ahmad, R. (2020). Factors Affecting Readers ’ Satisfaction In " Waspada " Newspapers : Insight From Indonesia. International Journal Of Research And Review Pyari). International Journal of Research and Review, 7(May), 357–371. https://doi.org/https://dx.doi.org/10.4444/ijrr.1002/1995
Fitriyah, V. D., & Hariono, B. (2023). Analisis Perbaikan dan Pemeliharaan Mesin Pencuci Tipe Raung Di PTPN XII Ngrangkah Pawon Kebun Pabrik Satak Kabupaten Kediri. Rona Teknik Pertanian, 16(2), 128–137. https://doi.org/10.17969/rtp.v16i2.32088
Irnain, U., & Hariono, B. (2023). Analisis Repair Maintenance dan Preventive Maintenance pada Mesin Huller di Industri Kopi. Jurnal Ilmiah Inovasi, 23(3), 251–258. https://doi.org/10.25047/jii.v23i3.3988
Islam, S. S., Letari, T., Fitirani, A., & Wardani, D. A. (2020). Analisis Preventive Maintenance Pada Mesin Produksi dengan Metode Fuzzy FMEA. JTT (Jurnal Teknologi Terpadu), 8(1), 13–20. https://doi.org/10.32487/jtt.v8i1.766
Leke, R. M. S., & Saifuddin, J. A. (2024). Proposed Total Productive Maintenance ( TPM ) Implementation to Increase Heading Machine Effectiveness Using Overall Equipment Effectiveness ( OEE ) Method on PT . XYZ. 5(2), 359–369. https://doi.org/10.22441/ijiem.v5i2.23832
Mahatma, A. V., & Aidil, J. (2023). Proposed Maintenance Plan for Maker Machinery with Reliability Centered Maintenance (RCM) Method and Maintenance Value Stream Mapping (MVSM) at PT. XYZ. IJIEM - Indonesian Journal of Industrial Engineering and Management, 4(3), 549. https://doi.org/10.22441/ijiem.v4i3.21445
Marpaung, K. F., & Bakhtiar, A. (2019). Analisis Kebijakan Maintenance Untuk Mengetahui Biaya Yang Paling Optimal Pada Mesin Multpacking System 023 (Studi Kasus pada PT Mayora Indah, Tnk Divisi Biskuit Jayanti). Jurnal Teknik Industri, 7(4). https://ejournal3.undip.ac.id/index.php/ieoj/article/view/23016
Muhaemin, G., & Nugraha, A. E. (2022). Penerapan Total Productive Maintenance (TPM) Pada Perawatan Mesin Cutter di PT. XYZ. Jurnal Ilmiah Wahana Pendidikan, 8(9), 205–219. https://doi.org/10.5281/zenodo.6645451
Nugraha, M., Sarmada, A., & Yulianto, A. D. (2021). Problem Related Paper Tension and Its Solution in Newspaper Production Using Web Offset Printing Machine. Kreator, 2(1). https://doi.org/10.46961/kreator.v3i2.296
Nurbani, S. N., & Seftiadie Y.P., J. (2019). Analisis Perbandingan Metode Preventive Maintenance Dan Corrective Maintenance Mesin Tenun Pada Departemen Weaving Di Pt. Bandung Sakura Textile Mills. Rekayasa Industri Dan Mesin (ReTIMS), 1(1), 22. https://doi.org/10.32897/retims.2019.1.1.178
Permana, I. I., & Arvianto, A. (2020). Analisis Preventive Dan Corrective Maintenance Loading Arm Pada Pt . Pertamina Tbbm Semarang. Wahana Teknik Sipil, 19(8), 1–9. https://ejournal3.undip.ac.id/index.php/ieoj/article/view/23056
Romadhon, A. S. K., & Trimarjoko, A. (2024). Markov Chain Method in Decision Implementation of Preventive Maintenance Scheduling to Reduce Equipment Downtime in PT . ADF Indonesia : Case Study. 5(1), 183–191. https://doi.org/10.22441/ijiem.v5i1.24820
Saroinsong, G. M., Patras, L. S., & Tulung, N. M. (2021). Analisys performance Circuit Breaker SF6 70kV at Sawangan Switchyard. Analisys Performance Circuit Breaker SF6 70kV at Sawangan Switchyard, 1–6. http://repo.unsrat.ac.id/id/eprint/5124
Sulaksana, R. M. T. (2023). Perancangan Alat Bantu Untuk Memperbaiki Postur Kerja Pada Aktivitas Menghitung Dan Menumpuk Koran Tribun Jabar. INNOVATIVE: Journal Of Social Science Researc, 4(1), 6281–6298. https://doi.org/10.31004/innovative.v4i1.8582
Taufik, M., Wijayanto, D., & Sofitra, M. (2019). Penentuan Prioritas Aset Peralatan Kritis Produksi PDAM XYZ dengan Metode Analytic Hierarchy Process. Jurnal TIN Universitas Tanjung Pura, 3(2), 33–42. https://jurnal.untan.ac.id/index.php/jtinUNTAN/article/view/35739
Wardhani, T. A. P., & Widjajati, E. P. (2023). Analysis of Total Productive Maintenance Using Overall Resource Effectiveness (ORE) Methods on Pellet Mill 3 Machine in PT. XYZ. IJIEM - Indonesian Journal of Industrial Engineering and Management, 4(3), 578. https://doi.org/10.22441/ijiem.v4i3.21478
Widiasih, W., & Aziza, N. (2019). Dengan Mempertimbangkan Penjadwalan. 14(02), 68–76. https://doi.org/10.33005/tekmapro.v14i2.90
DOI: http://dx.doi.org/10.22441/ijiem.v6i2.31177
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
IJIEM - Indonesian Journal of Industrial Engineering & Management
Program Pascasarjana Magister Teknik Industri Universitas Mercu Buana
Kampus Menteng - Gedung Tedja Buana, Floor 4th
Jl. Menteng Raya No. 29 Jakarta Pusat- Indonesia
Tlp.: +62 21 31935454 Fax: +62 21 31934474
http://publikasi.mercubuana.ac.id/index.php/ijiem
Email: [email protected]

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
The journal is indexed by:




1.png)
.png)
.png)
.png)







