Analisis Pelaksanaan Pekerjaan Konstruksi Preservasi Jalan Long Segment Berbasis Manual Program Evaluation And Review Technique (M-Pert) Dan Value Engineering (Ve)

ahmad fikry al-imam, Nunung Widyaningsih, Agus Suroso

Abstract


The provision in the 2014 National Medium-Term Development Plan (RPJMN) for the distribution of packages of national road preservation and maintenance activities with the Long Segment contract scheme was chosen by the Directorate General of Highways to improve connectivity between regions as set out in the infrastructure development strategy in Indonesia. The problem of delays in project implementation and work cost efficiency on road projects based on Long Segment contracts. The expected goal in this research was time and cost efficiency using the Manual Program Evaluation and Review Technique (M-PERT) and Value Engineering (VE) method. The analysis resulted in influencing factors, namely the process of activity stages (RII = 0.911), Planning (RII = 0.936), Implementation (RII = 0.919), Supporting (RII = 0.882) Structural Planning (RII = 0.952) Supervision (RII = 0.871) External conditions (RII = 0.769) and road preservation works (RII = .864). The case study using M-PERT method obtained a time optimization value of 1.21% with an accuracy of 98.79% of the completion time at the job site.


Keywords


Road Preservation, M-PERT; Value Engineering; Time optimization; Cost Efficiency

References


Budilukito, A., (2016), Kesiapan Kontraktor terhadap Kebijakan Preservasi Jalan Nasional di Sumatera Selatan, Jurnal HPJI, Vol. 2, No. 2.

Pablo, B. P. (2017),. "M-PERT: Manual Project-Duration Estimation Technique." Journal Construction Engineering and Management,.

Berawi, M. A. (2014), Aplikasi Value Enginering”. Jakarta. UI-Pres..

Priyatno, Heri (2010), Pengoptimalan Value Engineering pada Tahap Disain Bangunan Gedung Di Indonesia, thesis Un-Publised Universitas Indonesia, Depok.

Trochim, W.M.K. (2006). Research Methods Knowledge Base. Retrieved on January 25, 2010.

Enshassi A, Mohamed S, Mustafa ZA, Mayer PE. (2007). Factors Affecting Labor Productivity in Building Project in Gaza Strip. Journal of Civil Engineering and Management. ISSN 182-3605 online. 15(3): 269-280.

A guide to the project management body of knowledge (PMBOK Guide)., 6th edProject Management Institute, Inc.: Newtown Square, Pa., 201




DOI: http://dx.doi.org/10.22441/jrs.2024.v13.i1.06

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Rekayasa Sipil

JURNAL REKAYASA SIPIL
Fakultas Teknik Universitas Mercu Buana
Jl. Raya Meruya Selatan, Kembangan, Jakarta 11650
Tlp./Fax: +62215871335
p-ISSN: 2252-7699
e-ISSN: 2598-5051
http://publikasi.mercubuana.ac.id/index.php/JRS

email: [email protected]

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Web Analytics Made Easy - StatCounter
View My Stats

.