| .:::: JOURNAL RANK ::::. |
|---|
| Journal title | : | Rekayasa Sipil | ||
| Journal Initials | : | JRS | ||
| Online ISSN | : | 2598-5051 | ||
| Print ISSN | : | 2252-7699 | ||
| Accreditation Status | : | Sinta 4 Accredited Journal, No. 105/E/KPT/2022, from 7 April 2022, until 7 April 2027 | ||
| Frequency | : | 2 issues per year (February and September) | ||
| DOI Journal | : | 10.22441/jrs by Crossreff | ||
| OAI Journal | : | http://publikasi.mercubuana.ac.id/index.php/jrs/oai by OpenArchice.Org | ||
| Editor-in-chief | : | Muhammad Isradi , S.T., M.T., Ph.D | ||
| Managing Editor | : | Yunita Dian Suwandari, S.T., M.T., Ph.D | ||
| Publisher | : | Fakultas Teknik, Universitas Mercu Buana | ||
| Cite Analysis | : | Google Scholar, Sinta | ||
| Indexing | : | Google Scholar, Sinta, Garuda, and more. |
Rekayasa Sipil is a scholarly journal published twice a year, in February and September, by the Civil Engineering Study Program at Universitas Mercu Buana. First published in February 2012, the journal provides a platform for disseminating original research findings, new innovations, full-length technical papers, and scholarly discussions of previously published articles in civil engineering. It welcomes contributions that advance knowledge and support the development of civil engineering research and practice. For manuscript submissions or assistance with the submission process, please contact the editorial office at [email protected].
Current Issue
Articles
-
Analisis Faktor-Faktor Yang Mempengaruhi Quantity Surveyor dalam Proses Pengadaan Jasa Konstruksi Infrastruktur
-
PDF (Bahasa Indonesia)
Article Views: 248 times |
Article Downloads: 124 times
-
PDF (Bahasa Indonesia)
-
Analisis Faktor yang Mempengaruhi Pembengkakan Biaya Konstruksi (Cost Overrun) pada Proyek Konstruksi Jalan Nasional (Studi Kasus: Paket Ruas Jalan Nasional Wilayah II Provinsi Sumatera Barat)
-
PDF (Bahasa Indonesia)
Article Views: 245 times |
Article Downloads: 121 times
-
PDF (Bahasa Indonesia)
-
Analisis Perbandingan Penerapan Metode Earned Value dan Earned Schedule pada Pelaksanaan Proyek Konstruksi Underpass XYZ
-
PDF (Bahasa Indonesia)
Article Views: 195 times |
Article Downloads: 107 times
-
PDF (Bahasa Indonesia)
-
ANALISIS PENGARUH FAKTOR PERENCANAAN DAN FAKTOR PELAKSANAAN TERHADAP KETERLAMBATAN PROYEK JALAN TOL PROBOLINGGO – BANYUWANGI PAKET 2
-
PDF (Bahasa Indonesia)
Article Views: 172 times |
Article Downloads: 83 times
-
PDF (Bahasa Indonesia)
-
OPTIMASI PENGATURAN SIMPANG KASDA JALAN SOEKARNO HATTA – JALAN VETERAN KOTA PAYAKUMBUH
-
PDF (Bahasa Indonesia)
Article Views: 166 times |
Article Downloads: 92 times
-
PDF (Bahasa Indonesia)










