Analisa Pengendalian Persediaan Barang Dengan Perbandingan Metode Economic Order Quantity (EOQ) dan Just In Time (JIT) di PT. Astra Otoparts Tbk (Studi Kasus: Shop & Drive Sunter 1)

Authors

  • Bowo Priambudi Universitas Mercu Buana, Indonesia
  • Muhammad Kholil Universitas Mercu Buana, Indonesia

Keywords:

Supply, Inventory, EOQ Method, JIT Method

Abstract

This study aims to find out how the tire inventory control system is regulated according to current company policies and to find out how much the cost of merchandise inventory is Bridgestone Ecopia EP150 185/70R14, Bridgestone Ecopia EP150 175/65R14, Bridgestone Ecopia EP150 185/65R15 and Bridgestone Ecopia EP150 205/65R16 at Shop & Drive Sunter 1 for a period of 1 year (August 2021 – July 2022) then compare them using the Economic Order Quantity (EOQ) method and the Just In Time (JIT) method. The results of calculations using the Economic Order Quantity (EOQ) method are more effective and efficient if the company can optimize every aspect of inventory procurement including economical purchases, purchase frequency, safety stock. So get a total cost of Rp. 98,183,928 with an efficiency of Rp. 10,265,407.

Author Biographies

Bowo Priambudi, Universitas Mercu Buana

Program Studi Teknik Industri

Muhammad Kholil, Universitas Mercu Buana

Program Studi Teknik Industri

Downloads

Additional Files

Published

2024-01-10

How to Cite

[1]
B. Priambudi and M. Kholil, “Analisa Pengendalian Persediaan Barang Dengan Perbandingan Metode Economic Order Quantity (EOQ) dan Just In Time (JIT) di PT. Astra Otoparts Tbk (Studi Kasus: Shop & Drive Sunter 1)”, MBCIE, vol. 3, no. 1, pp. 45–54, Jan. 2024.

Conference Proceedings Volume

Section

Articles