Process improvement analysis in toll corridor development with lean six sigma approach: case in PT Jasamarga Related Business
DOI:
https://doi.org/10.22441/oe.2023.v15.i3.093Keywords:
project management, process improvement, lean, six sigmaAbstract
Toll Corridor Development (TCD) is one of the businesses conducted by PT Jasamarga Related Business as a follow-up to the issuance of Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat (PUPR) No. 28 of 2021. In the development of its first TCD project, Jasamarga Related Business (JMRB) encountered issues that resulted in the delay of the project's completion. The purpose of this research is to analyze and make improvements to the causes of delays in the Taman Mini TCD project. In this research, the lean six sigma approach is used to analyze process improvements that can be carried out so that these problems can be minimized in the further development of TCD. To identify activities that cause delays in the implementation of this project, the critical path method (CPM) was used based on the results of interviews with those directly involved in the development of TCD project. From the activities that cause the delay, a causal analysis is carried out using a fishbone diagram, and then an analysis of possible improvements is carried out using a lean concept approach. Based on the analysis results, three main issues are identified, namely inadequate planning process, ineffective partner or consultant selection process and delays in construction completion. From the cause-and-effect analysis, it can be concluded that potential improvements can be made by implementing the concept of pull planning, improving the business process by reducing waste and enhancing value-added activities, establishing effective stakeholder management, and maximizing the use of technology-based applications to aid project control.
Downloads
References
Al-Aomar, R. (2012). A lean construction framework with six sigma rating. International Journal of Lean Six Sigma, 3(4), 299–314. https://doi.org/10.1108/20401461211284761
Antony, J., & Banuelas, R. (2002). Key ingredients for the effective implementation of Six Sigma program. Measuring Business Excellence, 6(4), 20–27. https://doi.org/10.1108/13683040210451679
Arditi, D., & Gunaydin, H. M. (1997). Total quality management in the construction process. International Journal of Project Management, 15(4), 235–243. https://doi.org/10.1016/S0263-7863(96)00076-2
Bajjou, M. S., & Chafi, A. (2018). Lean construction implementation in the Moroccan construction industry: Awareness, benefits and barriers. Journal of Engineering, Design and Technology, 16(4), 533–556. https://doi.org/10.1108/JEDT-02-2018-0031
Ballard, G., & Howell, G. A. (2003). Lean project management. Building Research and Information, 31(2), 119–133. https://doi.org/10.1080/09613210301997
Bryde, D., Broquetas, M., & Volm, J. M. (2013). The project benefits of Building Information Modelling (BIM). International Journal of Project Management, 31(7), 971–980. https://doi.org/https://doi.org/10.1016/j.ijproman.2012.12.001
Demirkesen, S., & Bayhan, H. G. (2022). Critical Success Factors of Lean Implementation in the Construction Industry. IEEE Transactions on Engineering Management, 69(6), 2555–2571. https://doi.org/10.1109/TEM.2019.2945018
Diekmann, J., Krewedl, M., Balonick, J., Stewart, T., & Wonis, S. (2004). Application of lean manufacturing principles to construction.
Galli, B. J. (2018). Can project management help improve lean six sigma? IEEE Engineering Management Review, 46(2), 55–64. https://doi.org/10.1109/EMR.2018.2810146
Koskela, L., Ballard, G., Howell, G., & Tommelein, I. (2002). The foundations of lean construction. Design and Construction: Building in Value.
Porter, M. E. (1985). The Competitive Advantage: Creating and Sustaining Superior Performance. NY : Free Press.
Sawant, S. P., & Pataskar, S. V. (2014). Applying Six Sigma Principles in Construction Industry for Quality Improvement. Advances in Engineering and Technolgy, 407–411.
Slack, N., & Lewis, M. (2017). Operations Strategy (Fifth). Pearson Mission.
Stewart, R. A., & Spencer, C. A. (2006). Six-sigma as a strategy for process improvement on construction projects: A case study. Construction Management and Economics, 24(4), 339–348. https://doi.org/10.1080/01446190500521082
Ullah, F., Thaheem, M. J., Qayyum, S., & Khurshid, M. (2017). Influence of Six Sigma on project success in construction industry of Pakistan. TQM Journal, 29, 276–309. https://doi.org/10.1108/TQM-11-2015-0136
Van der Aalst, W. M. P., Stoffele, M., & Wamelink, J. W. F. (2003). Case handling in construction. Automation in Construction, 12(3), 303–320. https://doi.org/10.1016/S0926-5805(02)00106-1
Downloads
Additional Files
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.