Spare parts warehouse re-layout design with kaizen 5S implementation to reduce wasted time searching for machine parts
DOI:
https://doi.org/10.22441/oe.2023.v15.i3.095Kata Kunci:
kaizen, 5S, warehouse re-layout, reduce loss time, spare partsAbstrak
Increasing the productivity and efficiency of production machines cannot be separated from the availability of machine spare parts in the warehouse department. Delays in the delivery of spare parts if machine problems occur often become a problem that disrupts efficiency. This delay was caused by the search for engine spare parts in the warehouse taking too long to find. The long search time was caused by the irregular placement of the materials and the messy condition of the warehouse. This research aims to make improvements to the goods search process to make it faster and more effective in the warehouse area and increase warehouse capacity using warehouse re-layout. This research method uses the implementation of warehouse re-layouts combined with the application of Kaizen 5S in controlling the condition of machine spare parts. This research found that the reason for the long search time for machine spare parts was due to the lack of knowledge of warehouse operators and the absence of training regarding the application of the 5S method, as well as the careless placement of spare parts in warehouses that were not neatly arranged. This research has resulted in a reduction in search time for engine spare parts from 6.4 minutes to 4 minutes per spare part unit or a decrease of 36.5%. Meanwhile, the results of the warehouse re-layout resulted in an increase in warehouse capacity from 80 pallets to 316 pallets, an increase of 395%.Unduhan
Referensi
Abidin, N., Ahmarofi, A. A., & Gui, A. (2021). Designing the Re-re-layout Finished Goods Warehouse through the Simulation Method. International Journal of Industrial Management (IJIM), 10(1), 126–137. https://doi.org/10.15282/ijim.10.1.2021.6052
Abu, F., Gholami, H., Mat Saman, M. Z., Zakuan, N., & Streimikiene, D. (2019). The implementation of lean manufacturing in the furniture industry: A review and analysis on the motives, barriers, challenges, and applications. Journal of Cleaner Production, 234, 660–680. https://doi.org/10.1016/j.jclepro.2019.06.279
Agung, D., & Hasbullah, H. (2019). Reducing the Product Changeover Time Using Smed & 5S Methods in the Injection Molding Industry. Sinergi, 23(3), 199. https://doi.org/10.22441/sinergi.2019.3.004
Aprianto, T., Nuryono, A., Setiawan, I., Kurnia, H., & Purba, H. H. (2022). Waste Analysis in the Speaker Box Assy Process to Reduce Lead Time in the Electronic Musical Instrument Industry. Quality Innovation Prosperity, 26(3), 53–65. https://doi.org/10.12776/qip.v26i3.1744
Firmansyah, A., & Lukmandono, L. (2020). Desain Rere-layout Gudang dengan Metode Weighted Distance untuk Meminimasi Travel Time. Jurnal Sistem Teknik Industri, 22(1), 1–14. https://doi.org/10.32734/jsti.v22i1.3228
Haslindah, A., Andrie, A., Aryani, S., & Nur Hidayat, F. (2020). Penerapan Metode HAZOP Untuk Keselamatan Dan Kesehatan Kerja Pada Bagian Produksi Air Minum Dalam Kemasan Cup Pada PT. Tirta Sukses Perkasa (CLUB). Journal Industrial Engineering & Management (JUST-ME), 1(1), 20–24. https://doi.org/10.47398/just-me.v1i1.511
Havi, N. F., Lubis, M. Y., & Yanuar, A. A. (2018). Penerapan Metode 5S Untuk Meminimasi Waste Motion Pada Proses Produksi Kerudung Instan Di Cv . Xyz Dengan Pendekatan Lean Manufacturing. Jurnal Integrasi Sistem Industri, 5(2), 55–62.
Hidayatulloh, R., & Cahyana, A. S. (2022). Finished Paint Warehouse Re-Re-layout Using Slp and Shared Storage Methods to Minimize Material Handling Costs. Seminar Nasional & Call Paper Fakultas Sains Dan Teknologi (SENASAINS), 3(5), 1–10.
Jaqin, C., Kurnia, H., Purba, H. H., Molle, T. D., & Aisyah, S. (2023). Lean Concept to Reduce Waste of Process Time in the Plastic Injection Industry in Indonesia. Nigerian Journal of Technological Development, 20(2), 73–82. https://doi.org/10.4314/njtd.v18i4.1396
Kumar, A., Krishnamurthi, R., Nayyar, A., Sharma, K., Grover, V., & Hossain, E. (2020). A Novel Smart Healthcare Design, Simulation, and Implementation Using Healthcare 4.0 Processes. IEEE Access, 8, 118433–118471. https://doi.org/10.1109/ACCESS.2020.3004790
Kurnia, H. (2021). A Systematic Literature Review of Performance Pyramids System Implementation in the Manufacture Industries. 2(2), 115–126. https://doi.org/10.22441/ijiem.v2i2.11150
Kurnia, H., Putra, A. S., & Sjarifudin, D. (2022). Pendampingan Sebagai Upaya Pencegahan Kecelakaan Kerja Operator Forklift Terhadap fasilitas Perusahaan Pada bagian Warehouse. Jurnal Pengabdian Pelitabangsa, 3(02), 81–89. https://doi.org/10.37366/jabmas.v3i02.1541
Kurnia, H., Riandani, A. P., & Aprianto, T. (2023). Application of the Total Productive Maintenance to Increase the Overall Value of Equipment Effectiveness on Ventilator Machines. Jurnal Optimasi Sistem Industri, 1(22), 52–60. https://doi.org/10.25077/josi.v22.n1.p52-60.2023
Mridha, J. H., Hasan, S. M. M., Shahjalal, M., & Ahmed, F. (2020). Implementation of Six Sigma to Minimize Defects in the Sewing Section of the Apparel Industry in Bangladesh. Global Journal of Researches in Engineering (J), 19(3), 1–8.
Mukhtar, M. N. A., & Muhajir, M. A. (2020). Application of the Kaizen 5S Method for the re-layout of the Warehouse Section. Journal of Applied Industrial Engineering-University of PGRI Adi Buana, 03(2), 78–85. https://doi.org/0.36456/tibuana.3.01.2193.1-7
Nallusamy, S. (2016). Enhancement of productivity and efficiency of CNC machines in a small-scale industry using total productive maintenance. International Journal of Engineering Research in Africa, 25(August), 119–126. https://doi.org/10.4028/JERA.25.119
Nasution, S., & Sodikin, R. D. (2018). Perbaikan Kualitas Proses Produksi Karton Box Dengan Menggunakan Metode DMAIC Dan Fuzzy FMEA. Jurnal Sistem Teknik Industri. https://doi.org/10.32734/jsti.v20i2.488
Ngadono, T. S. (2018). Penerapan Kaizen Pada Line Trimming untuk Meningkatkan Jumlah Produksi Kaca Pengaman. Operations Excellence: Journal of Applied Industrial Engineering, 10(2), 197–208.
Purba, H. H., Mukhlisin, & Aisyah, S. (2018). Productivity improvement picking order by an appropriate method, value stream mapping analysis, and storage design: A case study in the automotive part center. Management and Production Engineering Review, 9(1), 71–81. https://doi.org/10.24425/119402
Rahman, F., Tarigan, Z. J. H., & Lukmandono, L. (2018). Desain Rere-layout Warehouse dengan Pendekatan Systematic Re-layout Palnning dan Class Based Storage untuk Meminimalkan Biaya Material Handling. Seminar Nasional Sains Dan Teknologi Terapan, 6(1), 533–540.
Ramdhani, R. A., & Supena, A. N. (2022). Perancangan Sistem Informasi Manajemen Persediaan Bahan Baku CV. X. Jurnal Riset Teknik Industri, 83–90. https://doi.org/10.29313/jrti.v2i1.961
Rizkiyah, N. D., Putra, R. A., Muhamma, Y. I., & Purnamasarih, M. (2023). Line balancing of aircraft IDG part maintenance process line balance using line balancing and pro model. Operations Excellence: Journal of Applied Industrial Engineering, 15(3), 1–11. https://doi.org/10.22441/oe.2023.v15.i1.067
Saputra, A. A., Wahyudin, W., & Nugraha, A. E. (2021). Evaluasi Aktivitas Manual Material Handling Dengan Menggunakan Metode Biomekanika Kerja Pada Pengangkatan Thiner di Bagian Warehouse. Jurnal SIstem Teknik Industri (JSTI) Vol., 23(2), 233–244. https://doi.org/10.32734/jsti.v23i2.6273
Setyaningsih, S., & Putri, R. C. (2015). Implementation of Lean Tools (Kaizen and 5S) in Stainless Steel Japanese Company Through Innovation. Operations Excellence: Journal of Applied Industrial Engineering, VII(3), 342–350.
Shobur, M., Nurmutia, S., & Pratama, G. A. (2021). Optimization of Staple Products Using the Supply Chain Operation Reference (SCOR) To Customer Satisfaction in Central Java. Sinergi, 25(3), 269. https://doi.org/10.22441/sinergi.2021.3.004
Shojaei, M., Ahmadi, A., & Shojaei, P. (2018). Implementation of Productivity Management Cycle with Operational Kaizen Approach to Improve Production Performance (Case Study: Pars Khodro Company). International Journal for Quality Research, 13(2), 349–360. https://doi.org/10.24874/IJQR13.02-07
Sjarifudin, D., & Kurnia, H. (2022). The PDCA Approach with Seven Quality Tools for Quality Improvement Men's Formal Jackets in Indonesia Garment Industry. Jurnal Sistem Teknik Industri (JSTI), 24(2), 159–176. https://doi.org/10.32734/jsti.v24i2.7711
Sjarifudin, D., Kurnia, H., Purba, H. H., & Jaqin, C. (2022). Implementation of the Six Sigma approach for increasing the quality of formal men’s jackets in the garment industry. Jurnal Sistem Dan Manajemen Industri, 6(1), 33–44. https://doi.org/10.30656/jsmi.v6i1.4359
Sugeng, U. M. (2016). Perancangan tata letak Warehouse Baru untuk Meningkatkan Kapasitas Penyimpanan Material dengan Metode Dedicated Storage di PT. XX. Jurnal Integrasi SIstem Industri (JISI), 3(1), 23–28. https://doi.org/10.24853/jisi.3.1.23-28
Uddin, M. M. (2021). Improving Product Quality and Production Yield in Wood Flooring Manufacturing Using Basic Quality Tools. International Journal for Quality Research, 15(1), 155–170. https://doi.org/10.24874/IJQR15.01-09
W Creswell, J. (2014). Research-Design_Qualitative-Quantitative-and-Mixed-Methods-Approaches Forth Edition. In V. Knight (Ed.), Sage Publication (Fourth Edi). Sage Publication Ltd.
Wahida, A., & Munir, M. (2021). Application Of Track Balance And Re-Re-layout Proposed Using Heuristic Methods And Activity Relationship Chart In The Integrating Process : A Case Study in PT. HAI. Journal Knowledge Industrial Engineering, 8(3), 215–223. https://doi.org/10.35891/jkie.v8i3.2754 1.
Wahyudin, C., Rahmawati, S., & Shafanah, N. (2019). Re-layout of Product Placement in the Retail Industry to Minimize Order Picking Time with Group Technology Method. Journal of Physics: IOP Conf. Series, 15(1), 1–6. https://doi.org/10.1088/1742-6596/1179/1/012092
Unduhan
File Tambahan
Diterbitkan
Cara Mengutip
Terbitan
Bagian
Lisensi
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.