Analysis overall equipment effectiveness (OEE) raw mill machine using DMAIC method in cement industry

Authors

  • Dimas Mukhlis Fathurohman Universitas Logistik dan Bisnis Internasional, Bandung, West Java, Indonesia
  • Dimas Mukhlis Fathurohman Universitas Logistik dan Bisnis Internasional, Bandung, West Java, Indonesia

DOI:

https://doi.org/10.22441/oe.2025.v17.i2.147

Keywords:

Downtime, Maintenance, Six Big Losses, OEE, DMAIC

Abstract

Equipment failure significantly impacts machine performance, leading to decreased productivity, increased repair costs, and reduced production output. PT XYZ, a company engaged in cement production, has been experiencing frequent downtime on the Raw Mill Plant 10 machine, resulting in abnormal production volumes and reduced efficiency. These issues contribute to the engine efficiency index remaining below the industry standard. To address these challenges, a comprehensive performance evaluation and improvement strategy is necessary. This study implements Total Productive Maintenance (TPM) by integrating the Overall Equipment Effectiveness (OEE) metric and applying the DMAIC (Define, Measure, Analyze, Improve, Control) methodology to identify and reduce inefficiencies. Additionally, a fishbone diagram is utilized to determine the root causes of the problem. The findings reveal that the OEE value for the Raw Mill machine is 80.78%, falling short of the 85% benchmark. Among the six big losses affecting equipment performance, speed losses account for 79.81%, making it the most dominant contributor to inefficiency. These results suggest the need for targeted improvements focused on minimizing speed-related disruptions, optimizing machine availability, and enhancing overall equipment performance to meet production targets and cost efficiency goals.

Downloads

Download data is not yet available.

Author Biographies

Dimas Mukhlis Fathurohman, Universitas Logistik dan Bisnis Internasional, Bandung, West Java

Manajemen Rekayasa

Dimas Mukhlis Fathurohman, Universitas Logistik dan Bisnis Internasional, Bandung, West Java

Manajemen Rekayasa

References

Mujayyin, F., Gunarso, D. A., & Mukhsinin, N. D. (2020). Analisis Keandalan Teknologi Pengolah Sampah TPA Menjadi Bahan Bakar Refuse Derived Fuels (RDF) dengan Pendekatan Six Sigma DMAIC. Jurnal Mekanik Terapan, 1(2), 133–141. https://doi.org/10.32722/jmt.v1i2.3360

Musyafa’ah, M., & Sofiana, A. (2022). Analysis of Total Productive Maintenance (TPM) Application Using Overall Equipment Effectiveness (OEE) and Six Big Losses on Disamatic Machine PT. XYZ. Opsi, 15(1), 56. https://doi.org/10.31315/opsi.v15i1.6630

Nurprihatin, F., Jodiawan, P., Fernando, N., & Gurusinga, G. K.-K. (2017). Usulan Perbaikan Performa Mesin Toelasting Glue dengan Integrasi OEE dan Metode DMAIC (Studi Kasus: Perusahaan Manufaktur Sepatu). Prosiding Seminar Nasional Teknologi Dan Informatika, 725–732.

Nurwulan, N. R., & Fikri, D. K. (2020). Analisis Produktivitas dengan Metode OEE dan Six Big Losses: Studi Kasus di Tambang Batu Bara. Jurnal IKRA-ITH Ekonomika, 3(3), 30–35.

Rozak, a, Shadrina, a, & Rimawan, E. (2019). Kaizenin world class automotive company with reduction of six big lossesin cylinder block machining line in Indonesia. International Journal of Innovative …, 4(7), 339–344. https://ijisrt.com/assets/upload/files/IJISRT19JL251_(1).pdf

Rozak, A., Jaqin, C., & Hasbullah, H. (2020). Increasing overall equipment effectiveness in automotive company using DMAIC and FMEA method. Journal Europeen Des Systemes Automatises, 53(1), 55–60. https://doi.org/10.18280/jesa.530107

Sibarani, A. A., Muhammad, K., & Yanti, A. (2020). Analisis Total Productive Maintenance Mesin Wrapping Line 4 Menggunkan Overall Equipment Effectiveness dan Six Big Losses di PT XY, Cirebon - Jawa Barat. Jurnal Rekayasa Sistem & Industri (JRSI), 7, 82. https://doi.org/10.25124/jrsi.v7i2.425

Sukma, D. I., Prabowo, H. A., Setiawan, I., Kurnia, H., & Fahturizal, I. M. (2022). Implementation of Total Productive Maintenance to Improve Overall Equipment Effectiveness of Linear Accelerator Synergy Platform Cancer Therapy. International Journal of Engineering, Transactions A: Basics, 35(7), 1246–1256. https://doi.org/10.5829/ije.2022.35.07a.04

Suryapradana, I., & Halim, A. (2021). Analisis Pengendalian Kualitas Menggunakan Metode Six Sigma Dalam Meningkatkan Kinerja Operasional Divisi Fixed Plant Maintenance Di Industri Pertambangan Pt Berau Coal. Sebatik, 25(2), 335–344. https://doi.org/10.46984/sebatik.v25i2.1542

Susianti, S. N. (2020). Analisis Perawatan Mesin Casting Zinc Menggunakan Metode Overall Equipment Effectivness (OEE) Melalui Pendekatan DMAIC. JENIUS : Jurnal Terapan Teknik Industri, 1(1), 30–37. https://doi.org/10.37373/jenius.v1i1.22

Wibisono, D. (2021). Analisis Overall Equipment Effectiveness (OEE) Dalam Meminimalisasi Six Big Losses Pada Mesin Bubut (Studi Kasus di Pabrik Parts PT XYZ). Jurnal Optimasi Teknik Industri (JOTI), 3(1), 7–13. https://doi.org/10.30998/joti.v3i1.6130

Downloads

Published

2025-07-31

How to Cite

[1]
D. M. Fathurohman and D. M. Fathurohman, “Analysis overall equipment effectiveness (OEE) raw mill machine using DMAIC method in cement industry”, OE, vol. 17, no. 2, pp. 227–234, Jul. 2025.

Issue

Section

Articles

Similar Articles

1 2 3 4 5 6 > >> 

You may also start an advanced similarity search for this article.