|
Issue |
Title |
|
Vol 13, No 3, (2021): OE November 2021 |
Peningkatan Produksi Plastik Injection dengan Analisis Overall Equipment Effectiveness dan Single Minute Exchange of Dies |
Abstract
PDF
|
Supriyati Supriyati, Tri Ngudi Wiyatno, Heru Darmawan |
|
Vol. 15, No. 2, (2023): OE July 2023 IN PRESS |
Reducing dandori processing time using the single minute exchange of die method in swaging areas in automotive rubber components company |
Abstract
PDF
|
Heri Sudarmaji, Rohmat Setiawan, Muhammad Adhika, M.Dimas Satria Pamungkas |
|
Vol 11, No 3, (2019): OE November 2019 |
Increasing the production capacity of copper drawing machine in the cable industry using SMED method: A case study in Indonesia |
Abstract
PDF
|
Lilik Setyawan |
|
Vol 9, No 3, (2017): OE November 2017 |
PENURUNAN REJECT CLAIM MARKET TERHADAP PLATE BENGKOK PADA BATTERY TYPE YTZ4V DENGAN METODA DMAIC-FAULT TREE ANALYSIS |
Abstract
PDF
|
Fidin Saptaaji, Erry Rimawan |
|
Vol 9, No 3, (2017): OE November 2017 |
PERBAIKAN WAKTU SET-UP DENGAN MENGGUNAKAN METODE SMED PADA MESIN FILLING KRIM |
Abstract
PDF
|
Feby Nurhadiyanto Arief |
|
Vol 9, No 1, (2017): OE Maret 2017 |
ANALISIS EFEKTIFITAS KINERJA EXCAVATOR PADA AKTIFITAS OB REMOVAL PENAMBANGAN BATUBARA MENGGUNAKAN METODE OEE: STUDI KASUS PT. RML EMBALUT – KALIMANTAN TIMUR |
Abstract
PDF
|
Arif Nuryono |
|
0 - 0 of 6 Items |
|