An Analysis of 5S Culture in Project-Based Learning: A Case Study in Furniture Production
DOI:
https://doi.org/10.22441/oe.2026.v18.i1.162Kata Kunci:
Vocational education, 5S implementation, Project-Based LearningAbstrak
Vocational education plays a crucial role in bridging the needs of the workforce through the implementation of industry-based curricula and industrial work culture. One relevant method for establishing a disciplined, efficient, and effective work culture is 5S (Seiri, Seiton, Seiso, Seiketsu, and Shitsuke). This study aims to analyze the implementation of 5S in Project-Based Learning (PBL)-based production activities at the Polytechnic of Furniture and Wood Processing Industry. Data were obtained through direct observation of production activities in the workshop. The results showed that the implementation of 5S was not optimal in several aspects. In the Seiri aspect, unnecessary materials and equipment were found in the work area. In the Seiton aspect, a component grouping and labeling still needed more consistent visual standardization and spatial arrangement. The Seiso aspect was the most critical finding, marked by the presence of oil spills, dust, and sawdust that disrupted cleanliness and potentially posed a safety risk. Meanwhile, the Seiketsu and Shitsuke aspects have demonstrated good implementation through the implementation of SOPs, routine inspections, and disciplined use of PPE. This study recommends improving procedures, regular inspections, visual arrangement, and fostering the habit of cleaning after use. Overall, strengthening the implementation of 5S is expected to improve production efficiency, workplace safety, and student readiness for entering the industrial environment.
Unduhan
Referensi
Abu Bakar, N., Rosbi, S., Abu Bakar, A., Che Arshad, N., Abd Aziz, N., & Uzaki, K. (2019). Framework of 5S Quality Management for University Ecosystem to Achieve Green Campus. International Journal of Scientific Research and Management, 7(12), 1441–1448. https://doi.org/10.18535/ijsrm/v7i12.em01
Bharambe, V., Patel, S., & Moradiya, P. (2020). Implementation of 5S in Industry: a Review. Multidisciplinary International Research Journal of Gujarat Technological University, 2(1), 12.
Damayanti, F., Etruly, N., & Ma’wa, S. P. (2023). Perancangan Standar Operasional Prosedur Laboratorium Komputer Dell Politeknik Industri Furnitur Dan Pengolahan Kayu. E-Jurnal Manajemen Universitas Udayana, 12(2), 198. https://doi.org/10.24843/ejmunud.2023.v12.i02.p05
Emaputra, A., Minan, N., Astanti, R. D., Mawadati, A., Sekarjati, K. A., Wibowo, A. H., Kustriyanto, K. F., Amami, I. N., & Ridho, M. (2023). Penerapan 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) Pada Pengecoran Logam Ikm Wintolo Di Yogyakarta. Abdimas Galuh, 5(2), 1493. https://doi.org/10.25157/ag.v5i2.11475
Etruly, N., & Nafi’ah, R. (2023). The Effect of Occupational Safety and Health on Employee Productivity in Furniture Industry. Management and Business Review, 7(2), 184–193.
Gupta, K. (2022). A Review on Implementation of 5S for Workplace Management. Journal of Applied Research on Industrial Engineering, 9(3), 323–330. https://doi.org/10.22105/jarie.2021.292741.1347
Guzel, D., & Asiabi, A. S. (2020). Improvement setup time by using SMED and 5S (An application in SME). International Journal of Scientific and Technology Research, 9(1), 3727–3732.
Kirani, C., Lukluk Isnaini, R., Amirus Sholichin, A., & Naufal Gumilang, A. (2023). 5S Culture of Excellence in Facilities and Infrastructure Management in Higher Education Institutions. Didaktika: Jurnal Kependidikan, 12(24), 547–556. https://jurnaldidaktika.org
Latifah Ahmad, T., & Nita Kusumawati, A. (2020). Systematic Literature Review: Implementasi Metode 5S Pada Perusahaan Manufaktur. Jurnal Teknologi Dan Manajemen Industri, 1, 31.
Made Iska Aprilia Wardhani, & Tasnim Nikmatullah Realita. (2022). 5S As a Form of Lean Manufacturing Implementation in the Perspective of Human Resources: A Case Study in Food SMEs. SOSMANIORA: Jurnal Ilmu Sosial Dan Humaniora, 1(4), 599–605. https://doi.org/10.55123/sosmaniora.v1i4.1275
Nurcahyo, R., Apriliani, F., Muslim, E., & Wibowo, A. D. (2019). The Analysis of the Implementation of 5-S Principles Integrated With ISO 9001 Requirements at Higher Education Level. SAGE Open, 1–10. https://doi.org/10.1177/2158244019870773
Puspitaningsih, F. I., & Etruly, N. (2023). Pengaruh Kualitas Pelayanan Workshop Terhadap Kepuasan Mahasiswa (Studi Di Politeknik Industri Furnitur dan Pengolahan Kayu). FIRM Journal of Management …, 8(1), 1–14. https://doi.org/10.33021/firm.v8i1.4018
Sundharesalingam*, D. P., Hemalatha, M. B., Priya, D. P. V., & Mohanasundari, D. M. (2020). Implementation of 5S to Improve the Productivity of Detergent Manufacturing Industry. International Journal of Recent Technology and Engineering (IJRTE), 8(6), 3858–3863. https://doi.org/10.35940/ijrte.f9423.038620
Tiara, T., Perdana, S., & Atikah, A. (2020). Analisis Metode 5S Pada Stasiun Kerja Pembuatan Rumah Boneka. Faktor Exacta, 13(3). https://doi.org/10.30998/faktorexacta.v13i3.5912
Utama, M. P., & Andesta, D. (2024). Implementasi Metode 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) pada Pengoperasioan Pengiriman Gas LPG dengan Pendekatan FMEA pada PT. XYZ. G-Tech : Jurnal Teknologi Terapan, 8(1), 722–731. https://ejournal.uniramalang.ac.id/index.php/g-tech/article/view/1823/1229
Unduhan
Diterbitkan
Cara Mengutip
Terbitan
Bagian
Lisensi
Hak Cipta (c) 2026 Operations Excellence: Journal of Applied Industrial Engineering

Artikel ini berlisensiCreative Commons Attribution-ShareAlike 4.0 International License.
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.











