FLOW SHOP SCHEDULING BASED ON PALMER-NEH, GUPTA-NEH AND DANNENBRING-NEH ALGORITHMS TO MINIMIZE THE ENERGY COST

Authors

  • Masrikhan Masrikhan Industrial Engineering Department, Faculty of Science and Engineering, Universitas Islam Negeri Sunan Kalijaga
  • Dwi Agustina Kurniawati Industrial Engineering Department, Faculty of Science and Engineering, Universitas Islam Negeri Sunan Kalijaga

DOI:

https://doi.org/10.22441/sinergi.2021.2.001

Keywords:

Dannenbring, Electricity, Energy Cost, Gupta, NEH, Palmer, Scheduling,

Abstract

In the manufacturing industry, the most widely used equipment is equipment that uses electricity. Electricity cost is one of the highest operational production costs after labor cost. So, it is very important to save and optimize the use of electrical equipment. One of the manufacturing industries is Taru Martani, Ltd. This research aims to minimize the energy cost by proposing three hybrid algorithms, namely Palmer-NEH, Gupta-NEH, and Dannenbring-NEH methods. Some scheduling evaluation is done using the Efficiency Index (EI) and Relative Error (RE) parameters. It is concluded that the Palmer-NEH and Gupta-NEH methods are the best methods with the lowest energy cost compared with company's actual method and the Dannenbring-NEH method. Based on the Palmer-NEH and Gupta-NEH methods, both methods can save the makespan up to 399.13 minutes or 6.65 hours compared with the company's actual method. With these methods, the company is also able to save the production cost by Rp. 818,043.00.

Downloads

Download data is not yet available.

Downloads

Published

2021-01-23

How to Cite

[1]
M. Masrikhan and D. A. Kurniawati, “FLOW SHOP SCHEDULING BASED ON PALMER-NEH, GUPTA-NEH AND DANNENBRING-NEH ALGORITHMS TO MINIMIZE THE ENERGY COST”, Sinergi, vol. 25, no. 2, pp. 111–118, Jan. 2021.

Issue

Section

Articles

Most read articles by the same author(s)

Similar Articles

> >> 

You may also start an advanced similarity search for this article.