The impact of construction management patterns on housing quality in housing residences
Abstract
This study examines how construction management patterns, self-performance versus subcontracting, and Project Manager (PM) leadership relate directly to housing quality in a residential project. Using a case study of the Vila Rizki Insani development (IDR 3,800,000/m²), a mixed-method approach integrated unit-level complaint records during a 90-day retention window, pre-handover homecare checklists for ready-stock units, project documents, and semi-structured interviews with PMs, foremen, and estate staff. Quantitative analysis compared the outcomes across two contractors: a self-performing contractor delivering 297 units and a subcontracting contractor delivering 106 units. Self-performing output showed lower normalized complaint rates (minor 2.36%, moderate 2.36%) but included a small incidence of serious defects (0.34%), whereas subcontracting showed a higher minor-complaint rate (8.4%), lower moderate complaints (1.88%), and no serious cases recorded during retention period. Qualitative findings indicate that contracting schemes structure accountability and inspection routines, shaping the PM’s practical leverage over workmanship; transactional control is easier to operationalize under self-performing teams, whereas fragmented trade packages in subcontracting increase interface gaps and finishing rework risk. Overall, contracting schemes and workforce capacity emerged as primary drivers of quality consistency under tight pricing, with complaint response speed influencing perceived quality. The study recommends aligning work packages with supervision capacity and formalizing inspection and post-sales response routines.
Keywords
Full Text:
PDFReferences
Amadi, A. (2023). Integration in a mixed-method case study of construction phenomena: From data to theory. Engineering, Construction and Architectural Management, 30(1), 210–237. https://doi.org/10.1108/ECAM-02-2021-0111
Arditi, D., & Mochtar, K. (2000). Trends in productivity improvement in the U.S. construction industry. Construction Management and Economics, 18(1), 15–27. https://doi.org/10.1080/014461900371066
Atkinson, R. (1999). Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International Journal of Project Management, 17(6), 337–342. https://doi.org/10.1016/S0263-7863(98)00069-6
Bass, B. M., & Avolio, B. J. (1990). Developing Transformational Leadership: 1992 and Beyond. Journal of European Industrial Training, 14(5). https://doi.org/10.1108/03090599010135122
Bass, B. M., & Riggio, R. E. (2006). Transformational Leadership (2nd ed.). Psychology Press. https://doi.org/10.4324/9781410617095
Burns, J. M. (1978). Leadership. Harper & Row.
Burns, R. P., & Burns, R. (2008). Business Research Methods and Statistics Using SPSS. SAGE.
Chan, D. W. M., Chan, A. P. C., & Ho, K. S. K. (2012). An empirical study of the relationship between leadership styles and project success. International Journal of Project Management, 30(2), 169–182. https://doi.org/10.1016/j.ijproman.2011.04.007
Clough, R. H., Sears, G. A., Sears, S. K., Segner, R. O., & Rounds, J. L. (2015). Construction contracting: A practical guide to company management (Eighth edition). John Wiley and Sons, Inc.
Costantino, N., & Pietroforte, R. (2004). Production arrangements by US building and non‐building contractors: An update. Construction Management and Economics, 22(3), 231–235. https://doi.org/10.1080/01446190310001649083
Eccles, R. G. (1981). The quasifirm in the construction industry. Journal of Economic Behavior & Organization, 2(4), 335–357. https://doi.org/10.1016/0167-2681(81)90013-5
Faraji, A., Rashidi, M., Perera, S., & Samali, B. (2022). Applicability-Compatibility Analysis of PMBOK Seventh Edition from the Perspective of the Construction Industry Distinctive Peculiarities. Buildings, 12(2), 210. https://doi.org/10.3390/buildings12020210
Gastil, J. (2014). Why I Study Public Deliberation. Journal of Deliberative Democracy, 10(1). https://doi.org/10.16997/jdd.183
Han, H., Ma, C., Yang, D., & Zhao, W. (2025). Transformational leadership and project success: The mediating roles of team reflexivity and project team resilience. Frontiers in Psychology, 16, 1504108. https://doi.org/10.3389/fpsyg.2025.1504108
Herzberg, F. (1966). Work and the nature of man. World Publishing Company.
Hsieh, T.-Y. (1998). Impact of Subcontracting on Site Productivity: Lessons Learned in Taiwan. Journal of Construction Engineering and Management, 124(2), 91–100. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:2(91)
Hua, Y., Wang, Y., Fu, Y., & Guo, W. (2025). Mitigating the Transaction Costs of Project Subcontracting Management: The Heterogeneous Effect of Behavior Control and Outcome Control. Buildings, 15(18), 3300. https://doi.org/10.3390/buildings15183300
Karim, S. A. (2020). Islamic Banking and Finance: Principles and Practice. John Wiley & Sons.
Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling (Twelfth edition). Wiley.
Lewin, K., Lippitt, R., & White, R. K. (1939). Patterns of aggressive behavior in experimentally created social climates. The Journal of Social Psychology, 10(2), 271–299. https://doi.org/10.1080/00224545.1939.9713366
Mallawaarachchi, V. T., Senanayake, S. M. A. H., Disaratna, V., & Perera, B. A. K. S. (2024). Application of subcontracting as a quality improvement tool for building constructions in Sri Lanka. International Journal of Construction Management, 24(1), 44–56. https://doi.org/10.1080/15623599.2023.2210487
Northouse, P. G. (2016). Leadership: Theory and practice (7th ed., Ed.). Sage Publications.
Toor, S. R., & Ofori, G. (2008). Leadership versus management: How they are different, and why it matters. Leadership and Management in Engineering, 8(2), 61–71. https://doi.org/10.1061/(ASCE)1532-6748(2008)8:2(61)
DOI: http://dx.doi.org/10.22441/jimb.v12i1.37944
Refbacks
- There are currently no refbacks.
Copyright (c) 2026 Jurnal Ilmiah Manajemen dan Bisnis

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Jurnal Ilmiah Manajemen dan Bisnis
Fakultas Ekonomi dan Bisnis Universitas Mercu Buana
Jl. Raya Meruya Selatan, Kembangan, Jakarta 11650
Tlp./Fax: +62215871335
ISSN: 2460-8424
E-ISSN: 2655-7274
http://publikasi.mercubuana.ac.id/index.php/jimb
This journal is indexed by:

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.





.jpg)
_.jpg)
