Analysis productivity of the mine facility department using the objective matrix method (OMAX): case study in coal mining company

Authors

  • Ade Putra Tahir Mulawarman University, Samarinda, North Kalimantan, Indonesia http://orcid.org/0009-0005-8891-8872
  • Suwardi Gunawan Mulawarman University, Samarinda, North Kalimantan, Indonesia
  • Theresia Amelia Pawitra Mulawarman University, Samarinda, North Kalimantan, Indonesia

DOI:

https://doi.org/10.22441/oe.2023.v15.i3.092

Keywords:

productivity, objective matrix, fishbone diagram

Abstract

PT Kideco Jaya Agung is one of the coal mining companies in Paser Regency, East Kalimantan, using an open pit mining system which at the end of 2012 succeeded in realizing the production, transportation, shipping target of 34 million tons. Coal mining is carried out using excavating equipment and hauling equipment. Activities begin with land clearing using bulldozers and / or small excavators, blasting overburden and / or removal of overburden, cleaning coal, loading and transporting coal to the ROM Stockpile. Throughout 2021 there has been a decrease in production results, it is necessary to analyze the productivity of the company's performance, which in this case leads to the Mine Facility department because it is directly related to production. The need to analyze productivity measurements so that it can be seen whether the Mine Facility department in this company is productive or not. The productivity measurement method that can be used to solve the problem is Objective Matrix (OMAX), because the OMAX productivity measurement model overcomes the problems of complexity and difficulty of productivity measurement by combining all important productivity criteria into an integrated form and interrelated with each other and easy to combine.

Downloads

Download data is not yet available.

Author Biographies

Ade Putra Tahir, Mulawarman University, Samarinda, North Kalimantan

Student of Industrial Engineering

Suwardi Gunawan, Mulawarman University, Samarinda, North Kalimantan

Industrial Engineering Department

Theresia Amelia Pawitra, Mulawarman University, Samarinda, North Kalimantan

Industrial Engineering Department

References

Beatrix, M., & Dewi, A. A. (2019). Analisa Produktivitas Dengan Menggunakan Model Pengukuran the American Productivity Center (Apc) Pada Produk Alumunium Sheet Dan Alumunium Foil. Jurnal PASTI, 13(2), 154. https://doi.org/10.22441/pasti.2019.v13i2.005

Deoranto, P., Harwitasari, A., & Morita Ikasari, D. (2016). Analisis Produktivitas dan Profitabilitas Produksi Sari Apel dengan Metode American Productivity Center di KSU Brosem. Industria: Jurnal Teknologi Dan Manajemen Agroindustri, 5(3), 114–124.

Eviyanti, N. (2021). Analisis Fishbone Diagram Untuk Mengevaluasi Pembuatan Peralatan Aluminium Studi Kasus Pada Sp Aluminium Yogyakarta. JAAKFE UNTAN (Jurnal Audit Dan Akuntansi Fakultas Ekonomi Universitas Tanjungpura), 10(1), 10. https://doi.org/10.26418/jaakfe.v10i1.45233

Faris, M., & Helianty, Y. (2015). Usulan Peningkatan Produktivitas Di Lantai Produksi Menggunakan Metode Objective Matrix (OMAX) (Studi kasus di PT Agronesia Divisi Industri Karet). Jurnal Online Institut Teknologi Nasional Jurusan Tehnik Industri No.04, 03(04), 253–263. https://www.google.com/url?sa=i&rct=j&q=&esrc=s&source=web&cd=&ved=0CAIQw7AJahcKEwj49LbOzPL_AhUAAAAAHQAAAAAQAw&url=https%3A%2F%2Fejurnal.itenas.ac.id%2Findex.php%2Frekaintegra%2Farticle%2Fdownload%2F923%2F1159&psig=AOvVaw1WRCwY31PyGfJ2UxXblpDS&ust=1688475

Fithri, P., & Firdaus, I. (2016). Analisis Produktifitas Menggunakan Metode ObjectiveMatrix (OMAX) (Studi Kasus: PT. Moradon Berlian Sakti). Jurnal Optimasi Sistem Industri, 13(1), 548. https://doi.org/10.25077/josi.v13.n1.p548-555.2014

Mukti, A. R., A’yun, Q., & Suparto, S. (2021). Analisis Produktivitas Menggunakan Metode Objective Matrix (OMAX) (Studi Kasus: Departemen Produksi PT Elang Jagad). Jurnal Teknologi Dan Manajemen, 2(1), 13–18. https://doi.org/10.31284/j.jtm.2021.v2i1.1525

Nasution, A. H. (2006). Manajemen Industri. Andi Yogyakarta.

Ramayanti, G., Sastraguntara, G., & Supriyadi, S. (2020). Analisis Produktivitas dengan Metode Objective Matrix (OMAX) di Lantai Produksi Perusahaan Botol Minuman. Jurnal INTECH Teknik Industri Universitas Serang Raya, 6(1), 31–38. https://doi.org/10.30656/intech.v6i1.2275

Ristanti, D. M. R., Lukmandono, & Prabowo, R. (2018). Analisis Produktivitas Dengan Pendekatan Metode APC Di Perusahaan Jasa Uji Tak Merusak/NDT. Conference on Innovation and Application of Science and Technology (CIASTECH 2018), September, 469–477.

Rizky Prastyo dan Lukmandono. (2019). Jurnal SENOPATI Sustainability, Ergonomics, Optimization, and Application of Industrial Engineering. Senopati, 1 No.1, 11–21.

Saori, S., Anjelia, S., Melati, R., Nuralamsyah, M., Djorghi, E. R. S., & Ulhaq, A. (2021). Analisis Pengendalian Mutu pada Industri Lilin (Studi Kasus pada PD Ikram Nusa Persada Kota Sukabumi). Jurnal Inovasi Penelitian, 1(10), 2133–2138.

Septifani, R., Citraresmi, A. D. P., & Emaradina, G. M. (2022). Application of objective matrix to improve performance green supply chain management. Advances in Food Science, Sustainable Agriculture and Agroindustrial Engineering (AFSSAAE), 5(2), 121-129.

Setiowati, R. (2017). Analisis Pengukuran Produktivitas Departemen Produksi Dengan Metode Objective Matrix (Omax) Pada Cv. Jaya Mandiri. Faktor Exacta, 10(December 2012), 199–209.

Supriyanto, A., Probowati, B. D., & Burhan, B. (2016). Pengukuran Produktivitas Perusahaan Tahu Dengan Metode Objective Matrix (Omax). Agrointek, 9(2), 109. https://doi.org/10.21107/agrointek.v9i2.2141

Wahyuni, H. C. (2017). Analisis Produktivitas. Umsida Press.

Waluyo, M. (2018). Produktivitas Untuk Teknik Industri. Teknik Industri, 73.

Wulandari, R., Ridwan, A. Y., & Muttaqin, S. (2021, October). Halal supply chain performance measurement model in food industry using SCOR model, AHP method and OMAX. In International Conference on Experimental and Computational Mechanics in Engineering (pp. 187-197). Singapore: Springer Nature Singapore.

Downloads

Published

2024-05-03

How to Cite

[1]
A. P. Tahir, S. Gunawan, and T. A. Pawitra, “Analysis productivity of the mine facility department using the objective matrix method (OMAX): case study in coal mining company”, OE, vol. 15, no. 3, pp. 263–273, May 2024.

Most read articles by the same author(s)

Similar Articles

<< < 1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.