Analisis Penjadwalan Proyek Pemasangan Sistem Konferensi Audio-Video Crestron dengan Metode Critical Chain pada Perusahaan Pertambangan
DOI:
https://doi.org/10.22441/pasti.2026.v20i2.007Keywords:
CCPM, Project Scheduling, Audio-Video Conference System, Operational EfficiencyAbstract
This research focuses on handling delays in the Video Conference project of a mining company through Critical Chain Project Management (CCPM). This study uses descriptive research methodology to collect and analyze primary and secondary data to interpret and draw conclusions. The main stages include network diagram, critical path, eliminating safe time, adding buffers, and comparing results to improve project scheduling. This research aims to provide effective recommendations for project planning and execution by emphasizing structured work breakdown, efficient resource management, and risk reduction using CCPM. The findings underscore the advantages of CCPM over traditional methods such as CPM/PERT, including better resource allocation, shorter project duration, and simpler monitoring. The use of buffers in this method proved to be very important in controlling the project schedule and reducing delays. The results of the study using CCPM showed that there was a 24% cut from the previous 50 days to 38 days. Future research can explore the application of CCPM in diverse project contexts to further validate its effectiveness. Overall, the application of CCPM promises improved project efficiency, reduced risk of delay, and better project outcomes.
Downloads
References
Aulady, M. F. N., & Orleans, C. (2016). Perbandingan Durasi Waktu Proyek Konstruksi Antara Metode Critical Path Method (CPM) dengan Metode Critical Chain Project Management (Studi Kasus: Proyek Pembangunan Apartamen Menara Rungkut). Jurnal IPTEK, 20(1), 13. https://doi.org/10.31284/j.iptek.2016.v20i1.29
Azis, S., P, E. H. D., & Supriyadi, D. (2017). Evaluasi Penjadwalan Pembangunan Hanggar PT. Gudang Garam, Tbk Menggunakan Metode Critical Chain Project Management (Studi Kasus Pembangunan Hanggar PT. Gudang Garam, Tbk di Waru, Siduarjo, Jawa Timur). Jurnal Info Manajemen Proyek, 6(2), 30-42.
Budi, S. (2009). Manajemen Proyek. Yogyakarta: Graha Ilmu.
Cerveny, J. F., & Galup, S. D. (2002). Critical Chain Project Management Holistic Solution Aligning Quantitative and Qualitative Project Management Methods. Production and Inventory Management Journal, 43, 55–64.
Faiizuddaroini, M., Nugroho, W., Supriyadi, & Nalhadi, A. (2022). Perencanaan Proyek Struktur Semi Gantry Crane Menggunakan Critical Chain Project Management. Operations Excellence: Journal of Applied Industrial Engineering, 14(2), 142–152. https://doi.org/10.22441/oe.2022.v14.i2.051
Fahmi, S., Mulyatno, I. P., & Zakki, A. F. (2023). Penerapan Critical Chain Project Management (CCPM) dalam Percepatan Proyek Reparasi KT. Selat Legundi II – 206 dengan Variasi Pemotongan Safety Time. Jurnal Teknik Perkapalan, 11(4), 38–47.
Febianti, E., Herlina, L., & Herfaisal, A. (2015). Analisis Proyek Konstruksi Menggunakan Critical Chain Project Management dan Lean Construction Untuk Meminimasi Waste. Prosiding Semnastek, November, 1–11.
Larasati, D. A., & Sutopo, W. (2020). Analisis Efektivitas Jadwal Proyek Implementasi Software dengan Critical Path Method: Studi Kasus. Jurnal INTECH Teknik Industri Universitas Serang Raya, 6(1), 55–64. https://doi.org/10.30656/intech.v6i1.2292
Leach, L. P. (2000). Critical Chain Project Management. Artech House.
Leach, L. P. (2014). Critical Chain Project Management (3rd ed.). Artech House.
Lianto, I. E., & Anondho, B. (2018). Analisis Besaran Koefisien Ketidakpastian Environmental Uncertainty (Eu) Yang Berpengaruh Pada Perhitungan Buffer Pada Critical Chain Project Management (Ccpm) Di Jakarta. JMTS: Jurnal Mitra Teknik Sipil, 1(2), 143. https://doi.org/10.24912/jmts.v1i2.2671
Mursyid, A. T., Hidayat, & Negoro, Y. P. (2025). Analisis Manajemen Proyek pada Proyek Instalasi Pipa dengan Metode CPM dan Metode PERT di PT. Cahya Mandiri Gemilang. INTECOMS: Journal of Information Technology and Computer Science, 8(2), 578–585. https://doi.org/10.31539/intecoms.v8i2.15002
Musfar, R. F., Manik, P., & Tuswan. (2023). Analisis Percepatan Waktu dan Produktivitas pada Proyek Reparasi Kapal KM Dharma Rucitra VII dengan Metode Critical Chain Project Management (CCPM). Jurnal Teknik Perkapalan, 11(4), 146–158.
Nurfitriansyah, M., & Indrayadi; (2019). Mengaplikasikan Metode Lean Project Management dan Metode Penjadwalan CCPM Dalam Tahap Perencanaan Proyek Konstruksi. Revista de Universidad de Tanjungpura, 200–214.
Ramanda N., R., & Arvianto, A. (2015). Penerapan Critical Chain Project Management Untuk Mengatasi Masalah Multi Proyek Dengan Keterbatasan Resources Di Pt Berkat Manunggal Jaya. Industrial Engineering Online Journal, 4 (2), 1–7.
Samodra, B. P. D., Santoso, A., & Wardhana, E. M. (2025). Critical Chain Project Management and Buffer Planning: Study Case at Security Accommodation Vessel Construction. International Journal of Marine Engineering Innovation and Research, 10(1), 137–145. https://doi.org/10.12962/j25481479.v10i1.22525
Sandora, R., & Tridya, D. R. (2025). Implementation of Critical Chain Project Management Method on Controlling the Pipeline Project. Tibuana: Journal of Applied Industrial Engineering, 8(1), 15–21. https://doi.org/10.36456/tibuana.8.1.9988.15-21
Siswanto, A. B. (2015). Manajemen Proyek (I. Hamidullah (ed.)). CV. Pilar Nusantara.
Soeharto, I. (1999). MANAJEMEN PROYEK (Dari Konseptual Sampai Operasional) (Edisi Kedua). Erlangga.
Sugiyanto, & Insan, K. (2022). Penerapan Optimalisasi Metode Critical Chain Project Management pada Pelaksanaan Proyek Konstruksi. Rang Teknik Journal, 5(2), 352–363. https://doi.org/10.31869/rtj.v5i2.3121
Suherman, S. (2016). Pengendalian Waktu Proyek dengan Menggunakan Metode Critical Chain Project Management (Ccpm) (Studi Kasus: Pembangunan Jalan SMK IT Payakumbuh). Jurnal Teknik Industri: Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 2(2), 104. https://doi.org/10.24014/jti.v2i2.5093
Suyansen, C. H., Sandika Martanto, W., & Nugraha, P. (2014). Penentuan Buffer Sizing Dalam Penerapan Critical Chain Project Management Pada Sebuah Proyek Konstruksi. Dimensi Pratama Teknik Sipil, 3(2), 1–8.
Wirawan, G. (2017). Penerapan Metode Critical Chain Project Management (CCPM) Dan Critical Path Method (CPM) Pada Penjadwalan Proyek Perbaikan Kapal BC30002. Institut Teknologi Sepuluh November, Surabaya.
Zohrehvandi, S., & Soltani, R. (2022). Project Scheduling and Buffer Management: A Comprehensive Review and Future Directions. Journal of Project Management, 7(2), 121–132. https://doi.org/10.5267/j.jpm.2021.9.002
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Jurnal PASTI (Penelitian dan Aplikasi Sistem dan Teknik Industri)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.