ANALISIS PERBANDINGAN PERSENTASE REJECT SEBELUM DAN SETELAH PENERAPAN PROJECT IMPROVEMENT TEAM DI MESIN CUPFORMING LINE 3 DI PT D dan D PACKAGING INDONESIA

Iin Alma Pegaria

Abstract


Abstract: The thesis aims to solve the problem in reducing reject level using PDCA and
8 Steps Quality Improvement. The results shows that the most dominant reject cup
because leak. Root causes of this reject caused by limitation of training to operator,
machine problem, no machine setting guidance and usage of more than one type of
material. Base on the root causes then improvements that have been made are operator
training, improved the machine, producing guidelines for setting the machine, and
allocation of material every single type of material in a period of time.
Keywords: PDCA, 8 Steps Quality Improvement, Reject Cup Forming.

Refbacks

  • There are currently no refbacks.