Evaluasi Penerapan Total Productive Maintenance Pada Mesin Slitting di Perusahaan Pipa Baja
Abstract
Keywords
Full Text:
PDFReferences
Al-Homaidi, E. A., Farhan, N. H., Al-ahdal, W. M., Khaled, A. S., Qaid, M. M. (2020). Factors Affecting Profitability of Indian Listed Firms: A Panel Data Approach. IJBEX, 23(1), 1-17.
Adesta, E. Y. T., Prabowo, H. A., Agusman, D. (2018). Evaluating 8 Pillars of Total Productive Maintenance (TPM) Implementation and Their Contribution to Manufacturing Performance. IOP Conference Series: Materials Science and Engineering, 290(24), 1-9.
Anthony, M. (2019). Analisis Penerapan Total Productive Maintenance (TPM) Menggunakan Overall Equipment Efectiveness (OEE) Dan Six Big Losses Pada Mesin Cold Leveller PT. KPS. Jati Unik (Jurnal Ilmu Teknik dan Manajemen Teknik), 2(2), 94-103.
Dawood, L. M., & Abdullah, Z. H. (2018). Study Impact of Overall Equipment and Resource Effectiveness onto Cement Industry. Journal of University of Babylon, 26(3), 187–198.
Dipa, M., Dewi Lestari, F., Faisal, M., & Fauzi, M. (2022). Analisis Overall Equipment Effectiveness (OEE) dan Six Big Losses Pada Mesin Washing Vial di PT. XYZ. Jurnal Bayesian: Jurnal Ilmiah Statistika Dan Ekonometika, 2(1), 61–75.
Febriyanti, D., & Fatma, E. (2018). Analisis Efektivitas Mesin Produksi Menggunakan Pendekatan Failure and Mode Effect Analysis dan Logic Tree Analysis. JIEMS (Journal of Industrial Engineering and Management Systems), 11(1), 39–47.
Gunawan, A., Kusnadi, K., Hamdani, H. (2021). Analisis Produktivitas Tenaga Kerja Dengan Metode Marvin E. Mundel pada CV. Mulia Tata Sejahtera. Jurnal Serambi Engineering, 3(6), 2135-2143.
Nakajima, S. (1988). Introduction to TPM: Total Productive Maintenance. In B. Norman (Ed.), Preventative Maintenance Series. Productivity Press.
Nugroho, Y., Amrina, Uly & Alfa, Bonitasari. (2020). A Recommendation of Breakdown Maintenance on Vehicle Engine Camshaft Line Using Reliability Centered Maintenance and FMEA Method. Operations Excellence: Journal of Applied Industrial Engineering, 12(3), 355-363.
Triana, Novera & Amrina, Uly. (2019). Menghitung Efektifitas Mesin Laser Cutting Menggunakan Metode Overall Equipment Effectiveness. Jurnal Penelitian Dan Aplikasi Sistem & Teknik Industri (PASTI), 13(2), 212–222.
Prabowo, H. A., & Agustiani, M. (2017). Evaluasi Penerapan Total Productive Maintenance (TPM) Melalui Pendekatan Overall Equipment Effectiveness (OEE) Untuk Meningkatkan Kinerja Mesin High-speed Wrapping di PT. TES. Jurnal Penelitian Dan Aplikasi Sistem & Teknik Industri (PASTI), 12(1), 50–62.
Prabowo, H. A., Suprapto, Y. B., & Farida, F. (2018). The Evaluation of Eight Pillars Total Productive Maintenance (TPM) Implementation and Their Impact on Overall Equipment Effectiveness (OEE) and Waste. SINERGI, 22(1), 13–18.
Talaba, G., Pattiapon, M., & Camerling, B. (2023). Analisis Efektivitas Maintenance Mesin Vertimill Dengan Perhitungan Overall Equipment Effectiveness (OEE) Pada PT. Nusa Halmahera Minerals (NHM). I Tabaos, 3(1), 17-22.
Wahid, A. (2020). Penerapan Total Productive Maintenance (TPM) Produksi Dengan Metode Overall Equipment Effectiveness (OEE) Pada Proses Produksi Botol (PT. XY Pandaan – Pasuruan). Jurnal Teknologi dan Manajemen Industri, 1(6), 12-16.
DOI: http://dx.doi.org/10.22441/pasti.2023.v17i3.002
Refbacks
Jurnal PASTI (Penelitian dan Aplikasi Sistem dan Teknik Industri)
Teknik Industri, Fakultas Teknik, Universitas Mercu Buana
Jl. Meruya Selatan, Kembangan, Jakarta Barat 11650
Tlp./Fax: +62215871335
p-ISSN: 2085-5869 / e-ISSN: 2598-4853
http://journal.mercubuana.ac.id/index.php/pasti/
This journal is indexed by:
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.